1)  cable installation
电缆施工
1.
This paper describes the features, difficulties, methods and problems of cable installation management in power plant project invested by foreigners.
介绍涉外电厂工程电缆施工管理的特点、难点、方法及应注意问题。
2)  cabling construction
线缆施工
3)  submarine cable operation
海缆施工
1.
Furthermore,the matters needing attention and the necessary measures during the submarine cable operations in the sand wave area are proposed,which will provide reference for the submarine cable operations in China Sea sea bottom sand wave area.
基于中国海大陆架区海底沙波的分布、形态和移动特征,分析了沙波对海缆施工的埋设张力和埋设深度的影响。
4)  optical cable layout
光缆施工
5)  main cable construction
主缆施工
1.
This paper takes LanCang Jiang suspension bridge as the background project and does researches on the main cable construction under temperature effect.
本论文以澜沧江悬索桥为工程背景,就主缆施工阶段温度效应的施工控制问题,有针对性地展开研究。
6)  cable craft
电缆工艺
补充资料:电缆施工


电缆施工
cable installation

管、绝缘套管和密封用袖管,然后套人手套。套好后用喷灯或电加热器加热,套管受热后收缩紧紧包住,管内涂有猫胶,受热时流动填满空隙,保证绝缘和密封良10 kV塑料电缆 户内型终端头1一护套;2一屏蔽线;3一芯屏蔽;4一芯绝缘;5一应力控制管.6一绝缘套管;7一袖管;8一手套好。应力控制套管是半导体材料制成的,其作用是:使在屏蔽层切除处因电场急剧改变而产生的集中电场应力分散,使电场强度沿应力控制管的长度逐步降低。袖管主要是密封用,三相线芯可用三种颜色的袖管。不使用热缩性材料时也可用绝缘带包扎,但要求包扎紧密。制作终端头时要严格保持施工现场的清洁和干燥,空气相对湿度不高于60%,气温一般在SC以上。从剥切电缆开始到完成必须连续进行。 对接头两根电缆连接的部件。施工主要工艺和要求与终端头相同。在把电缆剥去绝缘和屏蔽层后,用压接管连接两端导线,芯线均套上应力控制管和绝缘套管,两端的屏蔽层用包扎在线芯绝缘套管外的铜线相连,整个接头外套密封盒密封。 电气试验施工完成后测量绝缘电阻和作直流耐压试验,同时测量每个芯线的泄漏电流,泄 漏电流值及三相不平衡差值不大于标准为合格。对充油电缆还需对油质进行电气性能及含气量试验。d一onlon sh一gong电缆施工(eable installation)大型发电厂供动力、控制、保护、测量、热工信号等用途的电缆总长达数百乃至千余公里,连接全厂各处的设备和仪表.常用的敷设方式有隧道、沟道、支托架、直埋和排管等.施工内容有支架和保护管的加工与安装、电缆敷设、制作终端头、电气接线和试验工作等. 图纸准备电缆的规格多、数量大,布里在一个通道内的常多达数十至百余根,要做到敷设正确、排列整齐,摇要做细致的准备工作。要根据设计单位提供的电统平面布线图及电缆清册,仔细核对每根电缆的规格、长度和路径,绘制出主要通道中若干位置的电缆排列断面图,据以指导敷设作业。排列的原则是动力电缆在上,控制、通信等电缆在下;高压在上,低压在下;光缆应该放工在其他电力电缆的上面或悬吊在电缆架下面。横向排列要尽量减少电缆在通道中左右走向的交叉.还要核对托架和排管是否足够,对照库存各盘电缆的长度与各根需用长度,编制经济合理的用料方案。当采用计算机辅助电缆设计时,有全厂电缆敷设图.更有利于施工准备。