1) construction power supply
施工电源
1.
Application of construction power supply in first-phase project of Taishan Power Plant;
台山电厂一期工程建设中施工电源的运用
2) working sources
施工资源
1.
Based on the designed limit time of the project,combined the restriction of the working space and the working ground,the paper used fuzzy multi hierachical comprehensive evaluation and put forward two optimum decision making models that meet update level of social construction capacity and the working sources that a construction corporation owned.
从工程的计划工期出发,结合施工作业空间、施工场地对施工资源的使用种类、数量的限制,利用模糊数学知识,采用综合评判的方法,提出了现有社会生产力水平条件下及某施工企业具有施工资源条件下的两类施工方案评判模型,并以路基工程为例,给出了一实例,验证表明由上述模型决策所得的施工方案切实可
3) power construction
电厂施工
1.
Safety evaluation of power construction simply discussed;
浅谈电厂施工的安全评价
5) hydropower construction
水电施工
1.
Tactics related to managing final accounts of hydropower construction enterprises;
水电施工企业经营结算策略
2.
Analysis of characteristics and content of hydropower construction project management
水电施工项目管理特点与内容分析
6) cable installation
电缆施工
1.
This paper describes the features, difficulties, methods and problems of cable installation management in power plant project invested by foreigners.
介绍涉外电厂工程电缆施工管理的特点、难点、方法及应注意问题。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条