说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 钢筋混凝土桥梁结构
1)  concrete bridge construction
钢筋混凝土桥梁结构
1.
This article discusses detailedly the positions and styles of concrete bridge construction cracks at different conditions, andprovides the methods to repairing and preventing.
本文详细论述了钢筋混凝土桥梁结构在不同情况下产生裂缝的位置和形式,裂缝产生的原因、处治方法。
2)  Reinforced concrete bridge
钢筋混凝土桥梁
1.
The structure defection analysis and the reinforcing technology to the reinforced concrete bridge;
钢筋混凝土桥梁结构损伤的原因分析和加固措施
2.
Research on durability assessment for reinforced concrete bridge;
钢筋混凝土桥梁耐久性评估研究
3.
The durability of reinforced concrete bridge;
钢筋混凝土桥梁的耐久性
3)  reinforced concrete bridges
钢筋混凝土桥梁
1.
State-of-art of the mechanical behaviour of the corrosion reinforced concrete bridges;
锈蚀钢筋混凝土桥梁力学性能研究综述(Ⅱ)
2.
With the rapid development of transport routes,it is important to find out whether the bridge can meet the heavy cargo transport development and take on the needs of large equipment transport tasks, as well as after the passage of overloading of vehicles how much will fatigue properties change on the existing reinforced concrete bridges, which are issues of concern to the urgent need .
随着公路交通运输的快速发展,运输路线上的桥梁能否满足重载车辆运输发展的需要而承担起大型、重型设备的运输任务,以及超载车辆通过后对既有钢筋混凝土桥梁的疲劳性能等会产生多大的影响,这都是迫切需要关注的问题。
3.
Recently,the deterioration and damage of reinforced concrete bridges caused by durability inadequate were more and more serious and widespread,the normal use or security operations of the bridges were seriously affect,and the economic losses far beyond people\'s imagination.
近年来,由于耐久性不足造成钢筋混凝土桥梁结构劣化损伤的现象日益严重和普遍,已经严重影响到桥梁的正常使用和安全运营,其带来的经济损失之大远远超出人们的想象。
4)  RC beam bridge
钢筋混凝土梁桥
1.
The ultimate frequency can be taken as an important criterion for evaluating RC beam bridge load capacity.
:通过对钢筋混凝土梁进行不同荷载等级重复静载和动载的交替试验,测出结构从完整到破坏不同荷载等级作用后的频率、振型和阻尼等模态参数,考查其与梁承载力的关系,得出梁频率与荷载等级之间的关系和极限频率值,建议将极限频率作为评定承载力依据,由频率和荷载等级关系的经验公式进行非线性外推求极限承载力,对钢筋混凝土梁桥进行承载力评定。
5)  RC bridge
钢筋混凝土桥梁
1.
Study on the causes of insufficient durability of RC bridge and countermeasures;
钢筋混凝土桥梁耐久性不足成因分析及对策
2.
Date of domestic and international show that the economic loss caused of the harms of enduring disease of the bridge structure is very huge, and along with variety of environment, growth of service time , raise of function request, The durability problem of in service RC bridge is more and more outstanding.
目前,人们已深刻认识到钢筋混凝土桥梁由于混凝土结构材料自身和使用环境的特点,存在着严重的耐久性问题。
6)  Reinforced concrete beam bridge
钢筋混凝土梁桥
1.
The probability analysis of random seismic response for reinforced concrete beam bridge based on state equation method;
基于状态方程法的钢筋混凝土梁桥随机地震反应概率分析
补充资料:厂房钢筋混凝土结构安装


厂房钢筋混凝土结构安装
installation of reinforced concrete structure for workshop building

e卜ongfong gongjin hunn一ngtu Jiegou onzhuang厂房钢筋混凝土结构安装(installation ofreinforeed eonerete strueture for workshoPbullding)进入现场的厂房结构钢筋混凝土构件,经弹线并做好各种必要的标志后,选择合理吊点绑扎、吊装,经调正定位,固定到设计位置上的作业。根据现场条件和构件几何尺寸、重量的实际情况,构件可以在安装现场预制,亦可在工厂预制.钢筋混凝土构件有预应力构件和非预应力构件两种。 施工准备根据开口施工或闭口施工方案以及安装顺序和吊装工艺,安排构件预制的地点;重型柱、大吊车梁及大跨度屋架的预制位置应尽可能靠近安装地点,放在起重机的工作半径内,并选好合适的摆放方向。叠浇的水平预制件还要有正确的起模翻身和扶直措施。重型构件的预制场地若为回填土层时,应将其夯实,以防止地基下沉而损坏构件。构件吊装时,必须按设计规定的吊点或经过吊装应力核算确定的吊点进行绑扎,并用胶皮、厚纸等对构件表面进行保护,必要时应设置专用吊装梁或吊具。 安装方法钢筋混凝土结构的安装作业方式与钢结构的基本相同,可分单件流水作业和综合安装作业两种。其安装顺序分为吊装、找正固定和连接。 吊装较大面积的单层工业厂房或多跨厂房可用多台吊机分片、分段同时进行吊装,或用不同性能吊机进行协同吊装,如用履带式起重机吊装柱子和吊车梁,用塔式起重机吊装屋面结构。对于多跨厂房可选用回转半径较大的塔式起重机吊装2~3跨的构件。进行多跨厂房吊装时,要根据各跨特点,以其中一主跨为基准,先行安装,邻跨吊装则滞后2一3线,以合理分配公差。多层厂房吊装宜选用起重高度较大的塔式起重机。 找正固定首先应进行柱子和柱间支撑的固定。屋面结构的第一个跨间要先行找正和固定,以作为整个屋面结构安装的基础。吊车梁的调整固定一般在屋架固定后进行。多跨厂房应以主跨为基准进行调整固定,然后再固定其余各跨。多层厂房应先从下部构件开始固定,合格后再逐层调整固定上部各层结构。多层厂房的多节柱安装质量对整个厂房的安装质量有很大影响,安装时要注意各节柱的垂直度和平面位置的正确性,要控制好偏差,避免误差单向积累。在柱节点符合要求后再固定与之相连的梁与柱牛腿节点。多节柱找正时还要考虑阳光照射、温差对柱子垂直度的影响,柱子找正时要保持其自身的垂直度,不能以外力强拉。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条