1) Gudongkou Cascade Ⅱ hydropower station
古洞口Ⅱ级水电站
1.
For the parpose of generating electricity,the sediments at the front of the intake for Gudongkou Cascade Ⅱ hydropower station shall to be cleared effectively.
香溪河古洞口Ⅱ级水电站为发电需要要求进水口前淤积的泥沙进行有效的清除 。
3) Dongba Hydropower Station
洞巴水电站
1.
Dam Toe Slab Curtain Grouting Engineering Technology for Dongba Hydropower Station Construction;
洞巴水电站大坝趾板帷幕灌浆施工技术
2.
Overflow Weir Engineering Technology for Dongba Hydropower Station Construction;
洞巴水电站溢流堰施工技术
3.
Cushion Materials Engineering Technology for Dongba Hydropower Station Construction;
洞巴水电站垫层料施工技术
4) Dongping hydropower station
洞坪水电站
1.
Production test of the foundation grout curtain for the double curvature dam of Dongping Hydropower Station;
洞坪水电站双曲拱坝基础帷幕灌浆生产性试验
2.
Automatic control of long-distance feeding for aggregate storage bin of batching plant on left-bank of Dongping Hydropower Station
洞坪水电站左岸搅拌楼骨料仓远距离进料自动控制
3.
The powerhouse system of Dongping Hydropower Station in Hubei Province is a structure of underground cavern,with the characteristics of complex structure,big construction disturbance,difficult construction field and traffic.
湖北洞坪水电站厂房系统为地下洞室结构,具有结构复杂、施工干扰大、施工场地及施工交通困难等特点。
6) Shuikou hydropower station
水口电站
1.
No.19 dam block of Shuikou hydropower station;
水口电站19号坝段观测数据处理方法
补充资料:古洞口水电站
古洞口水电站 |
Gudongkou Hydropower Station |
概 述 |
古洞口水电站位于中国湖北省兴山县境内,长江支流香溪上游古夫河的古洞口峡谷出口处。混凝土面板堆石坝。最大坝高120m。坝址控制流域面积965km2,多年平均流量19.9m3/s,多年平均年径流量6.28亿m3。水库正常蓄水位325m,总库容1.38亿m3,调节库容0.69亿m3。为年调节水库,库容系数0.11,水量利用系数98.4%。该工程以发电为主,兼有防洪、灌溉、供水、养殖、旅游等多种效益。电站总装机容量4.5万kW。保证出力0.73万kW,多年平均发电量1.22亿kW·h。工程于1993年3月1日动工,1995年9月截流,大坝从1996年11月开始填筑。 |