说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水电站隧洞
1.
Research on the Initial Stress Field Around the Tunnels of the Jinping Hydroelectic Peoject;
锦屏水电站隧洞围岩初始地应力场研究
2.
Construction technology for tunnel of Furonghe Hydropower Station through shattered fault zone
龙胜县芙蓉河水电站隧洞断层破碎带施工技术
3.
Construction diversion tunnel(in combination with tailrace tunnel) design of Xiluodu Hydropower Station
溪洛渡水电站导流隧洞(与尾水洞结合段)设计
4.
The Research of Risk Management to Power House and Tunnel Project;
XX水电站“厂房隧洞工程”风险管理研究
5.
Analysis of Seismic Dynamic Response to A Tunnel of Hydroelectric Station
某电站水工隧洞地震响应的动力分析
6.
Optimization of Hydropower Tunnel Upper Flat Pipe Section Support for Hydropower Station
水电站引水发电隧洞上平管段支护优化研究
7.
ENGINEERING ANALYSIS OF THE GROUNDWATER DIVERSION TUNNEL OF DANBA HYDROPOWER STATION
丹巴水电站引水隧洞地下水工程效应分析
8.
Study on the Hydraulic Characteristics of Jinping Cascade-II Hydropower Station with Long Diversion Tunnel
锦屏二级水电站长引水隧洞水力特性研究
9.
Studies on Deformation Measurement for Surrounding Rock of Headrace Tunnels in a Certain Hydropower Project
某水电站引水隧洞群的围岩变形量测研究
10.
A Report about the Fabricating Penstocks for the Seepage Tunnel of Tianshengqiao Hydroelectric Power Station;
天生桥二级水电站三号引水隧洞压力钢管制作
11.
Rock Classification of Diversion Tunnel Study of Jinping Ⅱ Hydropower Station in Yalong River
雅砻江锦屏二级水电站引水隧洞围岩分类研究
12.
Three Dimensional Seepage Analysis on Diversion Tunnel of Jinping No.2 Hydropower Station
锦屏二级水电站引水隧洞三维渗流分析
13.
The Research for the reinforcement and lining structure characteristics in the diversion tunnel of a hydropower station
某水电站引水隧洞衬砌结构特性及配筋研究
14.
Rockmass plastic deformation treatment for diversion tunnel of Budong HPP
布东水电站引水隧洞岩体塑性变形的处理
15.
Construction Ventilation Design for Water Conveyance Tunnels of Hydropower Stations in Plateau Area
高原地区水电站引水隧洞施工通风设计
16.
Discussion on the Measure Method of the TBM Construction for the Diversion Tunnel of Jinping Hydropower Station
浅谈锦屏电站引水隧洞TBM施工测量方法
17.
Optimization of Construction Schemes of Diversion Tunnel in Jinping Second Cascade Hydropower Station
锦屏二级水电站导流隧洞施工方案优化
18.
The Smooth Blasting Technology of High Geostresses Section of the Diversion Tunnel on the Eastern End of Jinping II Hydropower Station
锦屏二级水电站东端引水隧洞高地应力洞段光面爆破技术