说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 新安江水电站
1)  Xin anjiang hydropower station
新安江水电站
1.
Contact grouting at steel lining of diversion steel pipe in Xin anjiang hydropower station;
新安江水电站1号机引水钢管钢衬接触灌浆工艺及效果分析
2.
Experimental study on dredging in tailrace of Xin anjiang hydropower station;
新安江水电站尾水河道清淤试验与研究
2)  Xinanjiang hydropower station
新安江水电站扩机
3)  Xin anjiang hydropower station
新安江水电厂
1.
Dam safety operation information management at Xin anjiang hydropower station;
新安江水电厂大坝安全运行信息管理实践
4)  Hsin-an River
新安江水
1.
Ultrafiltration of Hsin-an River- A Membrane Separation Approach;
膜分离技术处理新安江水
5)  Xin anjiang Reservoir
新安江水库
1.
On effect of ecological environment of Xin anjiang Reservoir;
浅论新安江水库的区域生态环境影响
2.
As a multi-year regulation storage reservoir,the flood risk of Xin anjiang reservoir is always less then some small and medium sized reservoir.
新安江水库作为多年调节水库有较大的调洪库容,在保证防洪安全前提下短期洪水调度追求发电效益最佳为调度的目标函数,从而有效地实现了洪水资源化。
6)  Xin anjiang Power Station
新安江电厂
1.
Discussion on importance of Xin anjiang Power Station to East China Power Grid;
新安江电厂对华东电网作用的探讨
补充资料:新安江水电站
新安江水电站

    中国浙江省建德市境内新安江上的坝式水电站。中国第一座自己勘测、设计、施工和自制设备的大型水电站。以发电为主,兼有防洪、灌溉、养殖、旅游等效益。控制流域面积约1.05万平方千米。平均年径流量113亿立方米。基岩为砂岩和石英砂岩。混凝土宽缝重力坝最大坝高105米,坝顶长465米。总库容220亿立方米。溢流坝通过发电厂房顶泄流,最大泄量13200米3/秒。总装机容量66.25万千瓦,设计年发电量18.6亿千瓦时。1957年开工,1965年竣工。
   
   

新安江水电站

新安江水电站

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条