说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 管幕工法
1)  pipe roofing method
管幕工法
2)  new tubular roof method
新管幕工法
1.
This paper briefly introduces a new tubular roof method(NTRM)and its construction steps characters and application sphere,discusses the key control points of a station in Shenyang metro based on the specific project example.
管幕工法相对于管幕工法是一种改进。
3)  On New Tubular Roof Method
新管幕工法概述
4)  pipe roof method
管幕法
5)  pipe curtain method
管幕法
1.
Discussion on waterproofing design in box culvert jacking plus pipe curtain method;
管幕法箱涵顶进施工工艺的防水设计探讨
6)  pipe-roofing method
管幕法
1.
On the basis of risk analysis, this paper discusses the construction risk under culvert box advancing of pipe-roofing method in soft clay area, including the advancing precisions of pipe-roofing, risk at the exit section, settlement controll and seal, the excavation stability and direction controlling, proposes the corresponding methods of risk prevention.
运用风险分析方法,讨论了软土地区管幕法箱涵顶进施工时存在的顶进精度、箱涵出洞风险、箱涵顶进的沉降控制及密封、箱涵开挖面稳定以及方向控制等风险因素,并指出了采用中继间顶进工法、高精度方向控制等相应防范措施的有效性。
补充资料:管工
1.指旧时工头。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条