1) step-overflow surface
台阶式溢流面
1.
Design of step-overflow surface of surface outlet on RCC gravity dam for Dachaoshan Hydropower Station;
大朝山水电站碾压混凝土重力坝台阶式溢流面设计
2) stepped overflow dam
台阶式溢流坝
1.
The characteristics of mean pressure on stepped overflow dam;
台阶式溢流坝的时均压强特性
3) stepped spillways
台阶式溢流坝
1.
Stepped spillways is a type of new spillway structure.
台阶式溢流坝是一种全新的泄水建筑物形式。
4) benched spillway face
阶梯式溢流面
1.
Research on hydraulic characteristic regularity for benched spillway face;
阶梯式溢流面水力特性规律研究
5) stepped spillway
台阶溢流坝
1.
Study on the flow aeration to prevent caviation of stepped spillway for Dachaoshan Hydroelectric Station;
大朝山水电站台阶溢流坝掺气减蚀问题的研究
2.
This paper analyses the problem of flow aeration for mitigating cavitation on stepped spillway.
根据大朝山水电站表孔减压模型试验资料,结合原型观测有关资料,对台阶溢流坝掺气减蚀问题进行了分析研究。
6) stepped spillway
台阶式溢洪道
1.
Energy dissipation in nappe flow on stepped spillways;
台阶式溢洪道中跌落水流的消能
2.
The characters of energy dissipation under different flows on stepped spillways;
台阶式溢洪道各流况的消能特性
3.
Study on the characteristics of time-average pressure of skimming flow in stepped spillway;
台阶式溢洪道滑行水流时均压强特性研究
补充资料:台阶坡面角
台阶坡面角
angle of bench slope
ta.j.e POmI0njlao台阶坡面角(angle of beneh slope)台阶坡面与水平面的夹角(见台阶)。其值与矿岩性质、岩层的倾角、倾向、构造、穿孔爆破方法和台阶存在时间等因素有关。台阶坡面角又分工作台阶坡面角和最终台阶坡面角。后者小于前者。台阶坡面角对工作帮坡角和最终边坡角有一定影响。中国金属矿山的台阶坡面角一般为65。一70。。 (蔡鸿起)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条