1) sliding zone soils
滑动带土
1.
A modified Singh-Mitchell’s creep function of sliding zone soils of Xietan landslide in Three Gorges;
三峡泄滩滑坡滑动带土的改进Singh-Mitchell蠕变方程
2.
Creep tests of sliding zone soils of Xietan landslide in Three Gorges Area;
三峡泄滩滑坡体滑动带土的蠕变试验研究
3.
The displacement and long term stablization of the old landslides in Three Gorges Area mainly depend on both the decreasing of strength and time effect of the mechanicl characteristics of sliding zone soils.
三峡古滑坡的变形和长期稳定的控制性因素在于滑动带土的力学特性的强度损伤积累和时间效应。
2) slip soil
滑带土
1.
Shear strength properties of slip soils of landslides: an overview;
滑带土强度特性研究现状
2.
3D stability analysis of landslides based on strength reduction (I): Back analysis for the shear strength of slip soils;
基于强度折减概念的滑坡稳定性三维分析方法(I):滑带土抗剪强度参数反演分析
3.
Research purposes: This paper estimates the residual strength of slip soil to provide liable strength parameters for landslide stability research and control design.
研究目的:评估滑带土残余强度,为滑坡稳定性研究和滑坡防治工程设计提供可靠的强度参数。
3) sliding soil
滑带土
1.
Characters of sliding soil of the loess landslide: A case study from Jiaoshushuwan, Tianshui
黄土滑坡滑带土的特点——以天水椒树湾滑坡为例
2.
In this research,a new kind of economic and suitable Ionic Soil Stabilizer(ISS for short) for improving the shear strength of sliding soil is studied.
本试验研究使用一种经济适用的离子土固化剂(Ionic Soil Stabilizer,简称ISS)对提高滑带土的抗剪强度进行了探索。
3.
Firstly, based on detailed analysis of engineering geology, environmental condition and combined with plenty of loess landside examples and data of sliding soil in Tongchuan, direct shear test and dynamic triaxial test in minor amplitude and long-term vibration are carried out on sliding soil of Jiaoping loess landslide in Tongchuan, so the r.
本文以铜川地区黄土滑坡为研究对象,从黄土滑坡滑带土的研究入手,对黄土滑坡机理进行研究。
4) slide-zone soil
滑带土
1.
An indoor theological experiment is carried out firstly on the slide-zone soil of Qingjiang Gushubao.
通过对清江古树包滑坡滑带土进行了室内流变试验,将试验结果进行分析,引入 Mesri 模型,采用 Singh-Mitchell 应变速率-时间关系方程来描述土体的蠕变特性,得出了该土的蠕变型式。
5) sliding-zone soil
滑带土
1.
According to the result of x-ray diffraction for the clay minerals in the sliding-zone soil of Miaoshangbei Landslide, the orientability of clay minerals had been quantitatively analysed.
根据小浪底库区庙上北滑坡滑带土粘土矿物的X射线衍射结果,进行定向性定量分析计算,得出滑带土粘土矿物颗粒的定向度为弱到中等定向,并以中等定向为主。
2.
And then, According to the result of x-ray diffraction for the clay minerals of the sliding-zone soil of Biaoshangbei Landslide, the orientability of clay minerals had been quantitative analyses and calculation.
本文首先论述了粘土矿物颗粒定向排列测定的基本原理并提出粘土矿物定向性定量评价方法,然后根据实例—庙上北滑坡的滑带土粘土矿物的X射线衍射结果,进行定向性定量分析计算,得出滑带土粘土矿物颗粒的定向度为弱到中等定向,并以中等定向为主。
6) landslide zone soil
滑带土
1.
The paper introduces the achievements and progress have been made on landslide classification, mechanism of formation, landslide zone soil and measures for prevention and control both at home and abroad and points out the problems and deficiencies existed in landslide prevention and control in Ch.
介绍了国内外在滑坡类型划分、形成机理、滑带土及防治措施等方面所取得的研究成果及其进展 ,指出了目前我国在滑坡防治方面存在的问题与不
补充资料:云杉大苗带土坨入冬移植技术
1.选择适宜栽植时间:11月下旬为好。一是此时大地已封冻,易带土坨。二是此时树木已进入休眠期,移植不影响树木的当年生长。三是可缓解造林与春季农忙劳力相争的矛盾。
2.选择优质苗木:标准是树冠完整,顶芽完好,无病虫害,生长健壮,高矮均衡,对合乎标准的树木做标识,可用塑料薄膜或带颜色的线绳拴于树枝上。
3.挖树坑:挖树坑可在大地封冻前进行,坑深80厘米,直径120厘米。
4.挖树:待大地封冻10厘米左右时,以树干基部为中心,挖半径为40厘米—45厘米、厚度为35厘米-45厘米土坨,需要注意的是土地过大、过厚不便于搬运,过薄过小容易伤根,不利于成活。在挖树过程中注意不要伤及树冠,挖树时绕树挖一周,达到深度后向内倾斜挖入10厘米,角度以45o-60o为宜。挖好后,先不要急于搬动,放置2—3天,待土地外表冻实后,利用长木杆撬起,在土地下部垫入土块,使土坨基部与暖层分离,再放置3—5天,使土坨完全冻实,防止运输搬运途中土坨因震裂松散。
5.栽植步骤:先把表土(土质不好的地块要事先拉客土备用)回填20厘米捣实,然后往坑中轻放树木,填土,在树坑周围用土围成一个直径为130厘米的浇水盘,以防浇水时水往外流。
6.灌水:栽植后灌水达到饱和状态,至水溢出为止,使土坨在坑中形成水与土地冻成一体,然后将浇水盘的土全部培在根部。
7.次年管理措施:(1)浇水。4月上旬,土壤开始解冻时,将根部的土壤扒开围成浇水盘,浇水时用铁锹将坑内的土壤空隙填实,浇水后培土扶正、踩实。此时浇水最为关键,对树木的成活起到决定作用,不容忽视。(2)修枝。时间选在4月下旬为宜,离地面20厘米以下(或力枝以下)的枝条全部修去。因为这部分枝条的补偿点是负的,清除这部分枝条可减轻树木本身消耗,保证成活,同时可使树形美观。以后几年进入正常管理,主要防止人为和牲畜破坏。(来源:黑龙江林业2003年第3期)
2.选择优质苗木:标准是树冠完整,顶芽完好,无病虫害,生长健壮,高矮均衡,对合乎标准的树木做标识,可用塑料薄膜或带颜色的线绳拴于树枝上。
3.挖树坑:挖树坑可在大地封冻前进行,坑深80厘米,直径120厘米。
4.挖树:待大地封冻10厘米左右时,以树干基部为中心,挖半径为40厘米—45厘米、厚度为35厘米-45厘米土坨,需要注意的是土地过大、过厚不便于搬运,过薄过小容易伤根,不利于成活。在挖树过程中注意不要伤及树冠,挖树时绕树挖一周,达到深度后向内倾斜挖入10厘米,角度以45o-60o为宜。挖好后,先不要急于搬动,放置2—3天,待土地外表冻实后,利用长木杆撬起,在土地下部垫入土块,使土坨基部与暖层分离,再放置3—5天,使土坨完全冻实,防止运输搬运途中土坨因震裂松散。
5.栽植步骤:先把表土(土质不好的地块要事先拉客土备用)回填20厘米捣实,然后往坑中轻放树木,填土,在树坑周围用土围成一个直径为130厘米的浇水盘,以防浇水时水往外流。
6.灌水:栽植后灌水达到饱和状态,至水溢出为止,使土坨在坑中形成水与土地冻成一体,然后将浇水盘的土全部培在根部。
7.次年管理措施:(1)浇水。4月上旬,土壤开始解冻时,将根部的土壤扒开围成浇水盘,浇水时用铁锹将坑内的土壤空隙填实,浇水后培土扶正、踩实。此时浇水最为关键,对树木的成活起到决定作用,不容忽视。(2)修枝。时间选在4月下旬为宜,离地面20厘米以下(或力枝以下)的枝条全部修去。因为这部分枝条的补偿点是负的,清除这部分枝条可减轻树木本身消耗,保证成活,同时可使树形美观。以后几年进入正常管理,主要防止人为和牲畜破坏。(来源:黑龙江林业2003年第3期)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条