1) bid cost comparison
报价成本比
1.
The certainty model of the risk of tender for engineering construction,bid cost comparison and tender probability on uncertainty measure is established.
给出了未确知测度、置信度的概念,建立了基于未确知测度的工程建设投标风险,报价成本比,中标概率确定模型。
2) bid to cost ratio
报价-成本比
1.
This paper presents a simplified optimum bidding model under the conditions that the distribution of lowest competitor bid to cost ratio is normal.
本文在最低报价-成本比服从正态分布的条件下,提出了一种计算投标报价的简化模型,可以近似地得到最优报价,并且减少了决策者的计算工作量。
3) cost offer
成本报价
1.
Basing on spot price theory, this paper proposed a cost offer model suitable for a power plant.
基于实时成本理论 ,介绍了一种适合于电厂报价的成本报价模型 。
2.
This paper introduces the tender offer cost issue in the code of valuation with bill quantity,provides some suggestions for the constructing enterprises to do a good job to be qualified for cost offer,and presents the principles for cost offer.
介绍了工程量清单计价规范招投标中投标成本报价的问题,对施工企业做好成本报价所应具备的条件以及成本报价确定的原则等提出了一些建议。
4) methods in quoting foreign exchange cost
换汇成本报价法
5) Bidding by its real cost
真实成本报价
6) A Brief Discussion on Tender Cost Offer
浅谈投标成本报价
补充资料:可比产品成本分析(generalproductcostanalysis)
全部商品产品成本分析的一个重要组成部分,主要是对可比产品成本的计划降低额和计划降低率的执行情况进行分析。在进行分析时,首先要计算出实际完成的降低额和降低率,然后与计划的降低额和降低率进行比较,以便了解可比产品计划的降低额和降低率进行比较,以便了解可比产品计划降低任务的完成情况。计划降低额和计划降低率、实际降低额和降低率的计算公式如下:
在进行以上分析基础上,还要进行原因分析。由于影响可比产品成本计划降低额完成情况的因素有产量、品种结构以及单位成本变动三个方面。
在进行以上分析基础上,还要进行原因分析。由于影响可比产品成本计划降低额完成情况的因素有产量、品种结构以及单位成本变动三个方面。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条