1)  last layer
后浇层
2)  post-cast
后浇
1.
An actual application example of post-cast program in large span struction is introduced,which may be good for reference to similar projects.
介绍了大跨结构后浇的运用实例,对同类工程的实际施工有参考意义。
3)  late poured band
后浇带
1.
Plugging reinforcing construction technology of the late poured band in the basement;
地下室后浇带堵漏补强施工技术
2.
Analysis on the structural late poured band design and the construction quality control;
浅析结构后浇带设计和施工质量控制
3.
On the construction of concrete late poured band of multilayer architecture;
谈多层建筑混凝土后浇带的施工
4)  post-grouting fake crack
后浇假缝
1.
The techniques adopted include UEA concrete expansive agent mixing, external waterproof coating and four-sections constructing, furthermore, "post-grouting fake cracks" have been settled between different sections by which post-grouting belts are cancelled, thus the constructing was accelerated, and perfect waterproofing effect is achieved as a result.
即掺UEA混凝土膨胀剂,外涂防水基,分四段施工,施工段之间设"后浇假缝",取消后浇带,加快了施工进度,获得了良好的防水效果。
5)  delay-pour joint
后浇连接
6)  post-pouring
后浇段
1.
The anti-cracking techniques are presented in this paper,including the double mixture technique,the post-pouring and cool water pipes set technique and the favorable casting time chosen to control the maximum temperature and the temperature difference between the outside and the inside.
野三河大桥主墩底座为高强大体积混凝土结构,为防止出现裂缝,施工中采取了双掺技术优化混凝土配合比、合理设置后浇段以及采用冷却水管内散外蓄和选择有利浇筑时间降低混凝土最高温度等裂缝控制措施,以有效地控制混凝土的最高温度和内表温差。