说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 超高支模
1)  ultra-high formwork erection
超高支模
1.
In this article, the author introduces some aspects of the 20 meters ultra-high formwork erection system of a project such as design, construction method, safety measures and application effect.
介绍了某工程的20m超高支模体系的设计、施工方法、安全措施和应用效果。
2)  full frame with ultra height and weight
超高、超重支模架
3)  super high supports for formwork
超高模板支架
4)  ultra-high formwork support
超高模板支撑体系
5)  ultrafine spun silk yarn
超高支绢丝
1.
Trial spinning is described through analysis on the spinnability of trivoltine cocoon waste material, which can produce ultrafine spun silk yarn due to its excellent spinnability.
试纺结果表明,三眠茧绢纺原料有良好的可纺性,并达到纺超高支绢丝的目的。
6)  high-formwork
高支模
1.
Discussion on the construction and safety of high-formwork;
浅谈高支模的施工和安全
2.
10.5 m high-formwork technology in the first floor construction of duty-free building in Shenzhen;
深圳免税大厦首层10.5m高支模技术
补充资料:木工支模拆模安全技术操作规程
第1条 模板支撑不得使用腐朽、扭裂、劈裂的材料。顶撑要垂直,底端平整坚实,并加垫木。木楔要钉牢,并用横顺拉杆和剪刀撑拉牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条