1)  Yindajihuang project
引大济湟工程
1.
As the natural test project of western route of South to North water transfer project in China,the deep-buried water transfer tunnel of Yindajihuang Project faces the problems of rockburst in hard rock and plastic deformation in soft rock under high geostress.
作为南水北调西线隧洞的天然试验工程,引大济湟工程的千米埋深引水隧洞也面临高地应力下硬岩岩爆和软岩塑性变形问题。
2)  Diversion project from Datong river to Huang river
引大济湟
3)  Yinda project
引大工程
4)  water diversion to Kunming project
引水济昆工程
5)  the project of leading water from Yangtze to Huaihe River
"引江济淮"工程
1.
Objective To learn about the survival condition of snails along the areas where the project of leading water from Yangtze to Huaihe River will be carried out.
目的 了解在“引江济淮”工程沿线地区钉螺生存情况。
6)  Diverting the Water of Yellow River to Relieve Datong"Project
"引黄济同"工程
1.
This paper introduces the general situation of “Diverting the Water of Yellow River to Relieve Datong”Project and, starting from the present situation of water supply od Datong City, discusses on the necessity of “Diverting the Water of Yellow River to Relieve Datong”Project.
介绍了“引黄济同”工程概况,并从大同城市给水现状出发,论述了“引黄济同”工程的必要性。
补充资料:“引大济湟”工程

"引大济湟"工程从湟水河一级支流大通河上游石头峡建库引水,将7.5亿m3大通河水,经29.6km调水干渠调入湟水河一级支流北川河上游的宝库河,解决湟水两岸山区和干流资源性缺水问题。工程实现后,可扩大农田灌溉面积118.44万亩,新增生态林草灌溉面积89.38万亩,向城市和工业用水增加供水量2.78亿m3,河道生态用水增加1.85亿m3。"引大济湟"工程因工程量大、投资大,本着"先易后难、分期实施、尽快见效"的原则,分三期实施。一期为黑泉水库和湟水北干渠一期工程,二期为石头峡水利枢纽、调水总干渠和北干渠二期工程,三期为南岸提灌工程。