1)  stilling pool slab
消力池底板
1.
The method was approved theoretically and tested in laboratory and then applied in the expansion joints of the stilling pool slabs in Ankang Hydropower Station in Shan xi Province.
本文结合实际工程需要,提出能适应水工建筑物伸缩缝大变形的U形止水带止水结构型式及其相应的施工工艺,从理论上和室内试验进行了论证,并在安康水电站消力池底板的伸缩缝进行了现场试验。
2)  underflow stilling pool
底流式消力池
1.
After research a new joint energy dissipator is determined, composed of surface spillway tail-flaring pier, breast spillway flow drop, underflow stilling pool.
该工程泄洪流量大、下泄功率高、河床水深偏浅且地质条件较差,通过研究,确定采用"表孔宽尾墩+中孔跌流+底流式消力池"新型联合消能工,溢流面设置掺气坎,减轻溢流坝面气蚀破坏,消力池底板厚5~8m,附加底板锚筋,满足安全需要。
3)  calculation of the stability of baseplate against floating of absorption basin
消力池底板抗浮稳定计算
4)  depth of force reducing pool
消力池池深
1.
10 in the course of designing the depth of force reducing pool in accordance with practice.
结合设计工作实践,在设计消力池池深时,对以淹没度σ=1。
5)  stilling basin
消力池
1.
Analysis of mechanism of jointed energy dissipation of stilling basin and aerated baffle and its validation by experiment;
掺气分流墩与消力池联合应用消能机理分析与试验验证
2.
A New Type of Flaring Gate Piers for Improving the Pressure Distribution on the Stilling Basin——XT Flaring Gate Piers;
一种改善消力池底板压强分布的新型宽尾墩——XT型宽尾墩
3.
Flexible pervious pipe applied for stilling basin of Xixiayuan hydropower project;
软式透水管在西霞院泄洪闸消力池的应用
6)  stilling pool
消力池
1.
Stability of stilling pool base slab under jet flow from tail-flaring piers;
宽尾墩射流作用下消力池底板的稳定
2.
Hydrodynamic load distribution in stilling pool of Baise Multipurpose Dam Project;
百色水利枢纽消力池动水荷载分布研究
3.
A non-linear FEM model capable of taking into account the load bearing characteristics of the key groove is established to study the settlement and stress of the stilling pool under various working conditions, according to the layout of the stilling pool during construction and the latest geological investigation of the non-uniform foundation information on Baise project.
针对百色消力池施工期布置方案,依据最新提供的不均匀地基的地勘资料,建立了能够计入键槽传力特点的非线性有限元分析模型,研究各工况下消力池的沉降及应力特征。
补充资料:消力槛


消力槛
baffle sill

  xiaolikan消力槛(b affle sin)设于泄水建筑物下游护坦末端的连续槛。其作用可以是蜜高护坦上水深,促使下泄水流在槛前形成底流式淹没水跃,也可以是将底部水流挑向水面,促进水流扩散,减少底部流速,削减下游侧边回流,使出池水流尽早恢复到河(渠)道的正常流速分布,缩短海漫长度。 消力槛可做成实体槛或齿形槛。实体槛断面一般为折线或曲线形实用堰,迎水面常采用直立面。试验表明,直立面对水流的反击力大,消能效果较为显著。齿形槛对水流的反击力小,其效果仅相当于合(高槛高度加低槛高度)的直立槛,但有助于槛后水流的横向和竖向扩散(见图)。 实体槛齿形槛 消力槛 消力槛水力计算的主要内容为确定槛高及槛的位置。在设计消力槛高度时应遵循以下原则:①槛前奎高的水深应满足在池中形成具有一定安全系数的淹没水跃;②过槛水流宜为淹没堰流。如过槛水流为自由溢流,应校核槛后水流衔接的流态,倘若出现远驱水跃,则需设置第二道消力槛或采取其他消能措施;③槛高应不影响建筑物的泄流能力。消力槛位置的确定,应使槛前所形成的清力池长度略大于或等于淹没水跃所需要的长度。 消力槛受水流顶冲,承受较大的水流冲击力,一般需采用钢筋混凝土结构,即使强度计算表明不需要受力钢筋,也应配置足够的构造钢筋,并与消力池底板内的钢筋可靠地连接在一起。(竺慧珠)
  