说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 少支架法
1)  method of limited brackets
少支架法
1.
On the basis of a practical project, a brief introducation is made on the application of the method of limited brackets on large-span CFST arch bridges, and an explanation is added to the camber calculation, the setting of subgrade and the elevation control over the panel joints in the erection process.
实践证明,少支架法安装大跨度钢管混凝土拱桥是合理的,不仅安全稳定性好,而且施工快、费用低。
2)  a few supported-point bracket
少支点支架
1.
Combined with the construction process of Suzhou Industrial Park North Ring Road East Extension Project integrally to be cast-in-site to cross Sujiahang Expressway,the article introduces the key techniques of a few supported-point brackets in the integrated cast-in-site construction of overpass bridge,which can be referred for the construction workers of bridges.
现浇立交桥的跨线施工中,使用少支点支架进行施工,不仅满足了下跨线的安全运营问题,而且操作简单、快捷,施工质量也可以得到了保证。
3)  timber supporting
木支架法
4)  bracket method
支架法
1.
Combined with the construction of Baisheyu bridge in Xizha expressway,this paper introduces the techniques of long span continuous box girder bridge with variable cross section by bracket method,which provides a reference to samiliar bridges construction.
本文结合西柞高速公路白蛇峪大桥施工工程,介绍了支架法分段浇注大跨度变截面连续箱梁关键施工技术,为同类桥型采用同种工艺施工有实际参考价值。
2.
The article introduces the pre-camber setting method during in-situ casting of simply-supported box beam with bracket method; makes initial analysis of the causes of over-camber and hereby brings forward controlling measures.
文章介绍了支架法简支箱梁预拱度的设置方法,初步分析了简支箱梁起拱原因并提出了控制方法。
5)  floating bracket method
浮运支架法
6)  balanced trestle
平衡支架法
1.
Based on the construction of Zongze Bridge at Yiwu,a new technology-the balanced trestle method is put forward for the construction of V-shaped piers of continuous rigid bridge and its structural calculation model is explained.
以义乌宗泽大桥为背景,提出了连续刚构桥V型墩施工的新技术———“平衡支架法”施工技术,并对该技术的结构计算模式作了说明。
补充资料:方框支架充填采矿法


方框支架充填采矿法
square set with fill method

fangkuong zh一J一0 ehongtlon eo一kuongfa方框支架充填采矿法(square一se‘with fillmethod)在采矿中,以一个或数个方框支架所占的空间为单元进行落矿、运搬矿石,随后立即架设方框支架,然后按区段充填采空区的充填采矿法。方框支架是由立柱、纵梁和横梁直角相交构成的。方框支架的规格主要有1 .osm只1.Osm只2.lm、l·sm只1·sm\2·lm和l·sm欠1.sm又2.lm三种,构件是外径为18ommh0一户0op,,/c 孚沃之;粉字多示二气J产。 a b cd 图1横向压力最大时方框支架构件的接合方法 d一立柱;b横梁;‘纵梁;d接合形式; 尸f一最大压力的方向框支架和充填体承受的压力也大。因此,这种采矿法适用于矿岩稳固性稍好和矿体厚度小于6~sm的矿体(2)垂直分条方框支架充填采矿法,分条宽度等于l一4个方框.长度等于矿体水平厚度。这种采矿法适合于矿岩稳固性稍差的矿体。(3)短矿块方框支架充填采矿法,矿块水平面积的边长相当于4~6个方框,这个面积又常常再划分为4块,对一条对角线上的两块进行超前回采。这种采矿法适合于矿岩稳固性更差的矿体,常用于开采间柱。用这种采矿法下向回采时要求矿岩稳固性好一些,而且矿块高度不超过15m。(4)按房和柱回采的方框支架充填采矿法,又称长矿块方框支架以上的圆木或方木。三种构件的联结处有桦头(图1)。作用于方框支架上的垂直压力最大时,使立柱桦头对接。作用于方框支架上的横向压力最大时使横梁桦头对接。横向压力来自上下盘岩石。使构件桦头对接是为了利用木材沿纤维方向抗压强度最大的优点。 分类根据矿块是否按矿房和矿柱回采,将这种采矿法分为全面回采和房柱回采。根据所回采矿段的形式,全面回采的方框支架充填采矿法又分为水平分层方框支架充填采矿法、垂直分条方框支架充填采矿法和短矿块方框支架充填采矿法。 结构参数和适用技术条件(l)水平分层方框支架充填采矿法,矿块长度为25一4Om,宽度等于矿体水平厚度。因同时回采的面积大,方充填采矿法此法要求矿房和间柱宽度为8一12m,长度等于矿体水平厚度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条