1) movable scaffolding method
活动支架法
1.
The main girder of the Bridge is designed as an approximate triangular section of triple cells and single box that is prestressed longitudinally, horizontally and vertically, and is constructed with movable scaffolding method.
沈阳市富民桥为跨径(89+242+89)m的折线形双塔单索面预应力混凝土斜拉桥,其主梁为三向预应力钢筋混凝土单箱三室近似三角形断面结构,采用活动支架法施工。
3) buttress and frame system
活动框架加固法;支柱和框架系统
4) mobile holder method
移动支架法
1.
Combined with the design practice,the paper mainly introduced the design points and characteristics of PC continuous box beam bridge by mobile holder methods.
结合武宿立交枢纽续建工程R匝道2号桥的设计实践,着重介绍移动支架法施工的预应力混凝土连续箱梁的设计要点和该桥的设计特点,为类似受时空界限的桥梁设计提供思路。
5) movable tank support
活动油罐支架
6) moving frame method
活动标架法
1.
This article analyzes the kinematics of 2 DOF manipulators based on moving frame method and some invariants are obtained.
用活动标架法研究了二自由度机器人机构的运动学 ,得出了机器人机构的一些不变量 ,并根据它们定义了机器人的平移体积、旋转体积、可操作性指标和灵活度 ,用这些指标评价机器人的操作性能。
补充资料:方框支架充填采矿法
方框支架充填采矿法
square set with fill method
fangkuong zh一J一0 ehongtlon eo一kuongfa方框支架充填采矿法(square一se‘with fillmethod)在采矿中,以一个或数个方框支架所占的空间为单元进行落矿、运搬矿石,随后立即架设方框支架,然后按区段充填采空区的充填采矿法。方框支架是由立柱、纵梁和横梁直角相交构成的。方框支架的规格主要有1 .osm只1.Osm只2.lm、l·sm只1·sm\2·lm和l·sm欠1.sm又2.lm三种,构件是外径为18ommh0一户0op,,/c 孚沃之;粉字多示二气J产。 a b cd 图1横向压力最大时方框支架构件的接合方法 d一立柱;b横梁;‘纵梁;d接合形式; 尸f一最大压力的方向框支架和充填体承受的压力也大。因此,这种采矿法适用于矿岩稳固性稍好和矿体厚度小于6~sm的矿体(2)垂直分条方框支架充填采矿法,分条宽度等于l一4个方框.长度等于矿体水平厚度。这种采矿法适合于矿岩稳固性稍差的矿体。(3)短矿块方框支架充填采矿法,矿块水平面积的边长相当于4~6个方框,这个面积又常常再划分为4块,对一条对角线上的两块进行超前回采。这种采矿法适合于矿岩稳固性更差的矿体,常用于开采间柱。用这种采矿法下向回采时要求矿岩稳固性好一些,而且矿块高度不超过15m。(4)按房和柱回采的方框支架充填采矿法,又称长矿块方框支架以上的圆木或方木。三种构件的联结处有桦头(图1)。作用于方框支架上的垂直压力最大时,使立柱桦头对接。作用于方框支架上的横向压力最大时使横梁桦头对接。横向压力来自上下盘岩石。使构件桦头对接是为了利用木材沿纤维方向抗压强度最大的优点。 分类根据矿块是否按矿房和矿柱回采,将这种采矿法分为全面回采和房柱回采。根据所回采矿段的形式,全面回采的方框支架充填采矿法又分为水平分层方框支架充填采矿法、垂直分条方框支架充填采矿法和短矿块方框支架充填采矿法。 结构参数和适用技术条件(l)水平分层方框支架充填采矿法,矿块长度为25一4Om,宽度等于矿体水平厚度。因同时回采的面积大,方充填采矿法此法要求矿房和间柱宽度为8一12m,长度等于矿体水平厚度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条