说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 发电容量充裕度评估
1)  generating capacity adequacy evaluation
发电容量充裕度评估
1.
A simulation method is proposed for the generating capacity adequacy evaluation of small isolated power systems(SIPS)including wind energy and energy storage facilities.
提出一种用于含风能和能量储存设备的小型孤立电力系统(SIPS)发电容量充裕度评估仿真方法。
2)  generation capacity adequacy
发电容量充裕度
1.
In addition,in view of the importance of generation capacity adequacy to power market,this paper mainly studied the power generation capacity adequacy evaluation method,it can evaluate the system adequacy,which in order to achieve the goal to supervise and ensure generation capacity adequacy.
另外,鉴于发电容量充裕度对保持发电市场长期稳定性的重要性,着重研究了电力市场环境下发电容量充裕度的评估方法,通过发电容量充裕度评估,以达到监控及保证发电容量充裕性的目的。
3)  generation capacity adequacy
发电容量充裕性
1.
For generation capacity adequacy(GCA)control purpose,implementing time-of-use power price can be regarded as preventive control and reserve capacity on generation side,interruptible load with low price,interruptible load with high reparations can be considered as emergency/corrective controls.
在发电容量充裕性的研究中,需求侧管理及需求侧备用市场通常是与发电侧备用市场孤立的。
2.
Since it is well acknowledged that the energy-only market could not ensure the generation capacity adequacy,a lot of research work has been done around the world to explore new ways to solve this important and yet difficult problem.
鉴于单一能量市场模式难以确保发电容量充裕性,国际上已提出多种旨在解决该问题的方法。
3.
It is a widely-discussed important issue to determine whether generation capacity adequacy could be ensured by the energy-only market approach.
能否完全依靠单一能量市场来确保发电容量充裕性是一个存在广泛争论的重要问题。
4)  generation adequacy
发电容量充裕
1.
This thesis presented a series of method and mechanism to regulate the generation adequacy in the market circumstance, considering some factors which affected the generation adequacy emerged during the process of market reformation.
发电容量充裕是确保电力系统安全稳定运行的重要条件和电力工业市场化改革能够得以成功进行的前提。
5)  Adequacy evaluation
充裕度评估
1.
Research on adequacy evaluation algorithm of generation and transmission systems based on the sequential Monte-Carlo simulation
基于序贯蒙特卡罗仿真的发输电系统充裕度评估算法
2.
The main difficulties in the large-scale composite generation and transmission system adequacy evaluation are the power flow calculation and the load curtailment analysis.
超大规模发输电系统充裕度评估的2个主要困难是潮流计算和切负荷计算。
3.
For adequacy evaluation,multiple contingencies of time- series of system states are transferred to single contingency based on duration sam pling of component states,which successfully deals with complexity of com putation.
计及多重故障影响的充裕度评估的最大困难是计算复杂性问题。
6)  capacity adequacy
容量充裕
1.
With market rules,bidding strategies and investment strategies of market participants being represented as experimental environment,this paper studies long term dynamics of generation capacity adequacy by using dynamic simulations of investment market interacted with power market.
借助电力市场与电力系统交互动态仿真平台,暂时用模拟的实验环境(市场规则、报价策略、投资策略)代替部分参与者的行为,以研究发电充裕度的长期动态行为,剖析容量充裕度长期振荡的机理。
补充资料:建筑容量评估法


建筑容量评估法


【建筑容工评估法】这种方法认为市地收益是它上面建筑容量的函数,单位土地面积上建筑容量愈大,获利愈多,地价和土地质量也愈好。一般的计算公式为:T=艺。‘P一“一r。式中T代表土地价值;艺。代表建筑容量;P代表建筑物售价;s代表土地开发成本;:代表土地开发利润。公式的经济意义是土地价值等于建筑物售价减去土地开发成本和土地开发利润。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条