说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 浮拖施工
1)  floating and hauling construction
浮拖施工
1.
With reference to the erection of the 150-m span Qingjiang Shihua Steel Arch Bridge,this paper introduces the application of floating and hauling construction technique to the erection of long span half-through basket handle steel arch bridges,and analyzes the key points and difficulties of the erection of monolithic steel arch blocks of the type of the bridges with the technique.
基于150m跨径的清江石化钢拱桥,介绍浮拖施工技术在大跨径中承式提篮钢拱桥施工中的应用,分析大跨钢拱桥整体浮拖施工的要点和难点。
2)  tow method
拖管施工
1.
The submarine pipeline project in Xiang\'an is the largest-scale submarine PE pipe water supply project constructed by tow method in China.
厦门市翔安原水跨海管道是我国迄今为止采用拖管施工的规模最大的跨海供水PE管道工程,工程采用了DN800的PE管,建成投运以来运行良好。
3)  pontoon [英][pɔn'tu:n]  [美][pɑn'tun]
施工浮桥
1.
Experimental research on the optimal pontoon axis in the 2nd stage river diversion for Merowe Hydroelectric Power Station in sudan;
苏丹麦洛维水电站二期导流下游施工浮桥轴线优选试验研究
4)  floating construction
浮水施工
1.
Taking the water conveying pipeline (DN2 000) project in Putian city of Fujian province as an example,this paper discusses about the floating construction method,procedure,technical control of quality and effects.
以福建省莆田市DN2000输水管道工程为例,论述浮水施工法的施工条件、施工过程、技术质量检控和效
5)  floating method
浮运施工法
6)  float towing
浮拖
1.
Analysis on force effect of marine pipelines during float towing;
浮拖过程海底管道力学分析
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条