1) cost control
造价监控
1.
Necessity to carry out whole procedure cost control of construction engineering;
建设工程中进行全过程造价监控工作的必要性
2) cost supervision
造价监理
1.
The experiences of construction supervision in the stage of construction showed that execution of cost supervision during the project construction was the effective way of cutting down the project cost.
通过施工阶段建设监理的实践 ,阐明在工程建设中实行造价监理是降低工程造价的有效途径。
3) monitoring slagging
监控造渣
1.
Trend and theory of monitoring slagging with CO concentration curve during BOF operation were discussed.
论述了炉气CO浓度曲线在转炉吹炼过程中监控造渣操作的原理及其变化与发展趋势;并利用该曲线的变化与发展趋势指导和监控了马钢120 t转炉造渣,防止了转炉喷溅,预测喷溅成功率达到85%以上,取得了良好的经济效益。
4) supervision and control of price
价格监控
6) cost control
造价控制
1.
The cost control of general contract in the FGD project of coal-fired power plant;
火电厂烟气脱硫工程总承包的造价控制
2.
Cost control of deputy construction project;
浅谈代建项目的造价控制
3.
On the institution design of highway project cost control;
浅谈公路项目造价控制的制度设计
补充资料:发电工程造价
发电工程造价
power project construction cost
fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条