说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 控制造价
1)  cost control
控制造价
2)  cost control
造价控制
1.
The cost control of general contract in the FGD project of coal-fired power plant;
火电厂烟气脱硫工程总承包的造价控制
2.
Cost control of deputy construction project;
浅谈代建项目的造价控制
3.
On the institution design of highway project cost control;
浅谈公路项目造价控制的制度设计
3)  construction cost control
造价控制
1.
Shallow discussion in the hospital capital construction project the contract management and the construction cost control;
浅谈医院基建项目中的合同管理与造价控制
2.
The construction cost control runs through the whole course of the engineering project construction.
造价控制贯穿于工程项目建设的全过程,阐述了设计阶段、招标投标阶段、施工阶段和竣工阶段控制工程造价的措施。
3.
In this paper,the characteristics of construction design stage are discussed, and five methods for construction cost control in design phase are put forward, which inspire us further to strengthen control and management in design phase as a governmental policy and ensure feasible technique and reasonable economy designs.
项目设计阶段是工程造价控制的关键阶段,但目前我们对设计阶段的造价控制的力度还是不够的。
4)  price control
造价控制
1.
The discussion on price control in tendering organizing in real estate development project
房地产开发项目招标组织中造价控制探讨
2.
Discusses to make the good price control of construction engineering from three aspects:the decision stage,the design stage and the implement stage.
就如何搞好建设工程的造价控制,从决策阶段、设计阶段、实施阶段3方面讨论了工程造价的控制。
5)  control of construction cost
造价控制
1.
In this paper the control of construction cost during engineering design was described and discussed.
对工程项目设计阶段的造价控制进行了分析与论述。
2.
The key measures to the control of construction cost in foundational construction in high school include choosing the optimum design project, guaranteeing the quality of design.
在高校基建工程造价控制工作中,优选工程设计方案和提高设计质量是控制工程造价的关键环节;实行工程招投标和选择优秀施工单位是降低工程造价的有效措施;严格管理施工程序是控制工程造价的重要环节;加强建筑材料管理工作是进行造价控制的迫切需要;认真做好工程预结算编审工作是控制造价的有效保证。
6)  project cost control
造价控制
1.
In this article,project cost control based on valuation with bill quantity was studied.
研究在工程量清单计价模式下造价控制,主要从工程量清单编制和工程量清单计价两方面进行论述,提出了在新的计价模式下进行造价控制的新概念。
2.
Then the basic theory of the cost of the project is studied,at last a final project cost control of the entire process,and the various stages of the work should be carried out.
本文回顾了对建设项目全过程造价控制的研究情况,阐述了我国当前建设项目造价管理存在的问题,并且对工程项目造价基本理论进行了研究,最后提出了工程项目进行全过程造价控制,并提出了各阶段应当进行的工作。
3.
Starting from the features of the project cost control of each stage of the engineering construction,this paper expounds that the key of the project cost control is in the design stage,and points out that should control the project cost by adopting scientific methods after the target is determined rationally.
从工程建设各阶段造价控制的特点入手,阐明控制造价的关键在设计阶段,指出在合理地确定控制目标后,应采用科学的方法对造价进行控制。
补充资料:发电工程造价


发电工程造价
power project construction cost

fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条