1) electricity gravitation
电引力
1.
According to the physics history records about Coulomb’s measuring electricity gravitation, the authors redesign and simplify the experiment to make it more instructive in teaching.
根据物理学史记载对库仑当年为测电引力而做的电摆实验进行了研究,在实验重现后对实验进行改进以使其更简易,更具教学意义;并对改进后的仪器做了相同的实验,分析改进前后的实验,找出各实验的优缺点。
2) Electric traction
电力牵引
1.
Development of electric traction system based on indirect field-oriented vector control scheme;
基于间接磁场定向的电力牵引系统的研究
2.
To enhance the railway transportation capacity by promoting electric traction;
大力发展电力牵引 提高铁路运输能力
3) Electrostatic Attraction
静电引力
1.
Multilayer films of PAA/PAn were successfully prepared by layer-by-layer self-assembly technique based on H-bond interaction and electrostatic attraction as driving force, PAn was doped in the preparation process of PAA/PAn multilayer films.
在PAA和PAn分子间的氢键和静电引力共同作用下通过层层自组装技术成功制备了PAA/PAn自组多层膜,在自组装成膜的同时实现了对本征态聚苯胺的酸掺杂,采用紫外-可见光谱、红外光谱、原子力显微镜、扫描电镜、X-射线反射光谱等手段对该自组装膜的生长过程、成膜机理、表面形貌、结构及膜厚等进行分析表征:3。
4) gravitational magnetic
引力电场
5) electromagnetic attraction
电磁引力
6) power lead
电力引入线
补充资料:厂用电受电
厂用电受电
energizing of auxiliary power system
chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条