1)  electrical engineering
电工程
2)  hydropower project
水电工程
1.
Methods of surface control surveying in the small hydropower projects;
小水电工程地面控制测量的几种方法
2.
Ecology and environment restoration in earth-rock construction of hydropower project;
电工程土石方施工的生态与环境保护
3.
Unconventional technology for blocking up diversion tunnel of a small hydropower project;
小型水电工程导流洞封堵的非常规技术
3)  generating electricity engineering
发电工程
1.
It analyzes to a few main paths that landfill gas has been made use of,generating electricity engineering especially.
分析了填埋气体资源化利用的几种主要途径,特别是发电工程
4)  hydropower engineering
水电工程
1.
The major coming science and technology problems in construction and operation of super hydropower engineering;
特大型水电工程建设和运行面临的主要科技问题
2.
The paper introduces the present concrete production system in hydropower engineering process.
以现在水电工程建设中的混凝土生产系统为基础,从水土保护保持、废水、废气、废油排放,粉尘污染,噪声污染,交通运输,废料,生活废水,垃圾等方面为工程提供混凝土生产系统的环保控制措施。
3.
Geological structures are often complicated in the underground structure region of hydropower engineering,and the 2D design method of underground structure has some limitations.
电工程地下洞室区域所处的地质构造往往比较复杂,二维设计方法有一定的局限性。
5)  hydroelectric project
水电工程
1.
Geological engineering classification for the high slopes of a hydroelectric project;
电工程高边坡的地质工程分类研究
2.
Early patterns of community composition and structure under 10-year-old tree plantations on the wasteland of Geheyan hydroelectric project were evaluated.
以隔河岩水电工程建筑废弃地初始生态恢复中人工构建植被为研究对象,在样地调查的基础上,分析了废弃地退化生态系统植物多样性和植物群落组成与结构的恢复对种植植物种类的生态响应。
3.
According to the characteristics of the hydroelectric project, using the principles of modern control theory and advanced technology of establishing model on the small samples as well as the modern statistic information technology, a mathematical model for casualty accident forecast is established in the present paper.
根据水电工程建设过程的特点 ,运用现代控制理论和系统辨识小子样建模新技术以及现代统计信息技术 ,建立了伤亡事故预测数学模型。
6)  transmission project
输电工程
1.
Based on the cost data of 20 transmission projects in State Grid Corporation of China,the budget estimate factor of projects cost is improved by the basic theory of correlation analysis.
基于国家电网公司20项输电工程的造价数据,运用相关分析基本理论,改进工程造价概算指标,在此基础上应用新的造价指标对输电工程造价进行预测。
2.
The quotation of terms of works for a transmission project can be determined by a term of a fundamental construction unit times effecting factor.
一个输电工程项目的工期定额可以用一个基本施工单元的工期乘以影响系数来确定。
参考词条
补充资料:三电工程
为提高进出境货物的通关速度,检验检疫机构积极推进%26ldquo;大通关%26rdquo;进程,开发建设了中国电子检验检疫系统工程,并逐渐形成了由电子申报、电子监管、电子放行组成的%26ldquo;三电工程%26rdquo;。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。