说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工程计价方式
1)  project valuation way
工程计价方式
1.
Because evolutionary reformation formed project valuation way "dual track system" and the market was unperfect and unordered,the environment for producing rent-seeking behavior was offered.
由于渐进式改革形成的工程计价方式“双轨制”及市场的不完善性和无序性,为寻租行为的产生提供了环境。
2)  Valuation Mode of Bill of Quantities
工程量清单计价方式
3)  cost evaluation mode
工程计价模式
1.
The comparative analysis of civil engineering cost evaluation mode between China and others;
我国建筑工程计价模式与国际惯例对比分析
4)  construction cost account method
工程造价计价方法
1.
With the issuance and application of the new quota system, the long-claimed separation principal of price and quantity has been applied to the new quota system and the construction cost account method changed great, some foreign advantaged construction cost account method are adopted.
随着新定额的颁布实施,被呼吁多年的量价分离在新定额中得到应用,工程造价计价方法也发生了重大变化,国外先进国家的工程造价计价方法被采用,但是,由于工程量清单计价的应用处于初始阶段,清单计价与英式计价还存在着一定的距离,笔者通过对比分析,提出了清单计价的发展方向。
5)  way of pricing through bill of quantity
工程量清单计价方法
6)  the project plan argumentation
工程设计方案评价
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)


坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle

一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条