1) Three Gorges Power Grid
三峡电网
1.
In this paper,the transient stability of Three Gorges Power Grid with HVDC links is analyzed by NETOMAC.
采用NETOMAC数字仿真法,分析研究了三峡-华东多回直流输电线路在直流线路故障(单、双极闭锁)时,直流调制措施(直流功率提升和切机措施)对保持三峡电网暂态稳定性的作用。
2) Three Gorges well network
三峡井网
1.
The Three Gorges well network is the first professional network in China established for the purpose of monitoring the groundwater precursors of reservoir induced earthquake.
三峡井网是我国第 1个以监测水库诱发地震的地下水前兆为目的的专业网 ,由 8口观测井构成。
3) three gorges power station
三峡电站
1.
Review and Prospect of Main Protection Design for Hydro-Generators of Three Gorges Power Station;
三峡电站水轮发电机主保护设计回顾与展望
2.
Influence of Peak Modulation of Three Gorges Power Station in Flood Season on the Navigation Conditions of the Reach Between the Two Dams;
三峡电站讯期调峰对两坝间河段通航条件影响的研究
3.
Effects of peak regulation at Three Gorges Power Station on navigation;
三峡电站调峰流量对航运的影响分析
4) TGP
三峡电站
1.
Experiment Study on the Influence of TGP Regulate Peak Flood to the Navigational Condition Between Two Dams;
三峡电站汛期调峰对两坝间通航条件影响试验
2.
In technology design stage,the cushion layer embedding and pressure controlled embedding patterns for TGP s unit spiral case were studied,and study for direct embedding scheme was conducted based on designed pressure controlled scheme in pre-stage.
三峡电站机组蜗壳在技术设计阶段研究了保压方案和垫层方案,直埋方案研究是在先期按保压方案设计的基础上进行的。
3.
A large quantity of output of gigantic TGP will be sent to Mid-China Electric System, and will be over 10% capacity of the system, hence, it will give an important impact to the system.
三峡电站地处华中,规模巨大,建成后送华中容量超过华中电网装机总容量10%,将对华中电力系统的运行产生重要影响。
5) Three Gorges Hydropower Plant
三峡电厂
1.
Signal processing technology in program design of monitor LCU for Three Gorges Hydropower Plant;
三峡电厂监控LCU程序设计中信号处理技术研究
2.
Common Unit Maintenance Flow of Three Gorges Hydropower Plant;
三峡电厂发电机组常规检修流程
3.
The maintenance project management system of the Three Gorges Hydropower Plant(TGHP) is based on the ePMS implemented successfully in TGHP.
三峡电厂检修项目管理系统是在三峡电厂已经成功实施的企业资产管理系统(ePMS)基础上,通过技术手段,在ePMS的技术框架体系内实现标准项目管理软件的功能,在一套系统中融合了企业资产管理和项目管理2种管理理念,较好地满足了电力企业以冬修为代表的大型检修项目管理的需要。
6) Three Gorges Hydropower station
三峡电站
1.
Application of positioning technology to ALSTOM generator set installation in Three Gorges hydropower station
三峡电站ALSTOM发电机组定位技术方案
2.
Using this model the optimum compensating dispatching in the cooperation of Three Gorges hydropower station with the hydropower station group .
在对三峡电力系统及电网内大型水电站特性分析的基础上,以提高水电站群整体调峰能力为目标,建立了水电站群优化补偿调度计算模型;并应用该模型对三峡电力系统水电站群与三峡电站联合运行进行了优化补偿调度研究。
3.
Taking Three Gorges hydropower station as engineering background,the linear interpolation technique to construct the pulsating pressure in the whole hydro-turbine flow passage is brought based on VGS hydro-turbine model test and finite element method.
三峡电站厂房结构的振动问题是三峡工程建设的关键问题之一。
补充资料:《国际大电网会议会刊》
《国际大电网会议会刊》
Electra
Guo]一DaD一anwong Hulyl Hu一kan《国际大电网会议会刊》(E之‘‘tra)创刊于1967年,双月刊,12开本。由国际大电网会议(International Conferenee on Lar罗High VoltageElectric Systems)CIGRE编辑出版。编辑部地址:CIGRE,21 rue d.Artois,75008 Paris,Franee;E一mail:eigre@world一net,sct,fr; 网址:http://www.worldnet.net/~eigre· 该刊是国际大电网会议会刊,选登国际大电网会议各专业组的有关论文,介绍各专业组的讨论摘要,报道会议活动简讯等。用英、法文对照出版。 该刊的读者对象是电力、能源部门的科技人员。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条