1.
Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit
三峡电站700MW水轮发电机组国产化实践
2.
Application of positioning technology to ALSTOM generator set installation in Three Gorges hydropower station
三峡电站ALSTOM发电机组定位技术方案
3.
Study on the Casting Process of the Three Gorges Turbine Blade
三峡电站水轮机叶片的铸造工艺研究
4.
The Rigidity and Strength Analysis on Hydraulic Turbine Runner of the Three Gorges Power Station(Right Bank)
三峡电站(右岸)水轮机转轮刚强度分析
5.
Exploration into PROFIBUS-DP based network communication for lifting equipment in The Three Gorges’ power plant
三峡电站起重设备PROFIBUS-DP网络通讯初探
6.
Analysis of water level at Yichang Station due to daily storage of the Three Gorges power station
三峡电站日调节对下游宜昌站水位的影响
7.
The Electric Capacity Benefit of the Three Gorges Hydropower Stationat Water Storage Level 135 m in the Situation of Cofferdam;
三峡电站蓄水位135m围堰发电的容量效益
8.
Field Measurement and Analysis on Very Fast Transient Overvoltage of GIS in Three Gorges Power Plant
三峡电站GIS快速暂态过电压现场试验及分析
9.
Sanxia hydro-power will supply electric power to Henan province after completion of construction.
三峡水电站建成后将向河南电网供电。
10.
Application of Arc-extinguishing and Over-voltage Protection Device at the Three Gorges Project Power Service Station and the Three Gorges Dam Area
消弧及过电压保护在三峡电源电站和三峡坝区35kV系统中的应用
11.
The Studies on the Operation Management of the Sanmenxia Hydropower Station;
三门峡水电站运营管理若干问题研究
12.
Analysis of VGS Unit Thrust Bearing for Three Gorges Left-bank Power-plant
三峡左岸电站VGS机组推力轴承分析
13.
Concrete construction techniques for Three Gorges underground power hause
三峡水电站地下厂房混凝土施工技术
14.
Features of the Alarm Mechanism of Computer Supervisory System of Three Gorges Right Bank Power Station
三峡右岸电站监控系统报警机制特点
15.
Layout and maintenance of construction control network of Three Gorges Underground Powerstation
三峡地下电站施工控制网布设与维护
16.
The Researching of Turbine Main Parameters Selection for Three Gorges Right Bank Power Station
三峡右岸水电站水轮机参数选择研究
17.
Function Design and Implementation of AVC in Three Gorges Right Bank Hydropower Station
三峡右岸电站AVC功能设计及实现方法
18.
Electric braking on the right bank of the Three Gorges power station on the relay the impact of downtime
三峡右岸电站电气制动停机对继电保护的影响