1) long distance construction
长距离施工
3) long-distance and multi-curves pipe-jacking
长距离、多曲线顶管施工
1.
The technical characteristics and problems easily produced of the long-distance and multi-curves pipe-jacking construction for city sanitary work are analyzed and discussed.
对城市给排水工程中的长距离、多曲线顶管施工技术的特点及易出现的问题进行了分析探讨,并对顶进参数、施工测量、中继间设置等几项重要技术要点进行论述,供大家探讨。
4) long distance construction with shield method
长距离盾构法施工
5) adjacent construction
近距离施工
1.
According to the features of control in shield adjacent construction,the control model of the whole process—APLOC has been established based on IMC-PID controller with consideration of the effects of earth balance pressure at workface and shield tail grouting parameter on ground deformation.
针对盾构近距离施工中变形控制的特点,以变形控制为目标,采用系统控制论的思想和方法,提出一种基于内模控制的IMC-PID参数整定方法的盾构施工控制方法。
6) long working distance
长工作距离
1.
New CCD refracting objective of a short tube length with a long working distance on microscope is suggested and analyzed in detail.
提出一种新型的长工作距离短镜筒透射式的CCD显微物镜,并作了详细地分析,给出该系统的光学设计结果和数
补充资料:长距离跑
简称长跑。最初项目为3英里、6英里跑,从19世纪中叶开始,逐渐被5000米跑和10000米跑替代。据记载,现代最早的正式长跑比赛是1847年4月5日在英国伦敦举行的职业比赛,英国的杰克逊(william jackson)以32分35秒0的成绩夺得6英里跑冠军。奥运会比赛项目男、女均为5000米跑和1000米跑。男子项目1912年列入;女子5000米跑1996年列入,10000米跑1988年列入。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条