1) long-distance pressurized water supply project
长距离供水工程
1.
This paper analyzes the reasons and types of the generation of the water hammer in long-distance pressurized water supply project,puts forward some common protective measures of water hammer,and points out some matters needing attention in the preoperation of the project.
分析了长距离供水工程中水锤产生的原因与类型,提出了水锤常见防护措施,指出了工程试运行时的注意事项。
2) long-distance diversion project
长距离引水工程
1.
Regulating reservoir plays an important role in the function demonstration,safety guarantee and stable operation of long-distance diversion project.
调节水库对于长距离引水工程的功能发挥、安全保障和稳定运行中具有重要作用。
3) Long distance water transfer project
长距离输水工程
1.
Long distance water transfer project often takes the form of the combination of open-channel flow, pipe flow and pumping station.
长距离输水工程常常采用明流、有压流、泵站相结合的方式,由于明流、有压流、泵站的过渡过程是互为因果,相互影响的,因此对明流、有压流联合的水力过渡过程和泵站的调节过程进行整体研究十分必要也很有意义。
4) long-distance horizontal drilling hole
长距离水平工程孔
5) long distance pressure water delivery
长距离压力供水
6) long-distance water relay
长距离串联供水
补充资料:长距离跑
简称长跑。最初项目为3英里、6英里跑,从19世纪中叶开始,逐渐被5000米跑和10000米跑替代。据记载,现代最早的正式长跑比赛是1847年4月5日在英国伦敦举行的职业比赛,英国的杰克逊(william jackson)以32分35秒0的成绩夺得6英里跑冠军。奥运会比赛项目男、女均为5000米跑和1000米跑。男子项目1912年列入;女子5000米跑1996年列入,10000米跑1988年列入。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条