说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 天桥水电站
1.
Study on the layout pattern of new spillway structure of Tianqiao hydropower station
天桥水电站新增泄水建筑物布置型式研究
2.
Preliminary Research on the Navigational Condition Influenced by Tian Qiao Hydroelectric Station During Daily Regulation
天桥水电站日运行方式对航运影响的初步研究
3.
Treatment of Cracks on Runner Blade of Turbines In Tianshengqiao Hydropower Station
天生桥一级电站水轮机转轮裂纹处理
4.
A Report about the Fabricating Penstocks for the Seepage Tunnel of Tianshengqiao Hydroelectric Power Station;
天生桥二级水电站三号引水隧洞压力钢管制作
5.
Experiment on shutting of emergency overhaul gate in surge shaft of Tianshengqiao cascade II hydropower station
天生桥二级水电站事故检修闸门动水下门试验
6.
The Design and Construction of RCC Dam in Tianshengqiao-Ⅱ Hydropower Station
天生桥二级水电站碾压混凝土坝的设计与施工
7.
Plague focus investigation in the region of Tianshengqiao reservoir in Guizhou
贵州省天生桥水电站库区沿岸鼠疫疫源地调查
8.
Study on Aeration Mitigation of Cavitation for the Spillway of TIANSHENGQIAO-1 Hydropower Station;
天生桥一级水电站溢洪道掺气减蚀研究
9.
Treatment of Unsettled Problems on Resident Relocation of Tianshengqiao Ⅱ Hydropower Station;
天生桥二级水电站移民遗留问题的对策研究
10.
Treatment of Over Vibration in 4# Unit of TSQ-1 Hydropower Station
天生桥一级水电站4号机组振摆超标的处理
11.
Reformation of Protection against Lightning for the Safety Monitoring Automation System for Diversion Tunnel in TSQ Ⅱ Hydropower Station
天生桥Ⅱ级水电站引水隧洞安全监测系统防雷改造
12.
Choice and Similarity Calculation of Ventilation System for Hydrogenerator of Tian Shengqiao Water Power Station StepⅡ
天生桥Ⅱ级电站水轮发电机通风系统选择及相似计算
13.
INVESTIGATION OF ENGINEERING SETTLEMENT AND PAYMENT IN THE CONTRACT OF THE TIANSHENGQIAO HYDROPOWER PROJECT;
天生桥水电站工程承包合同的工程结算支付探析
14.
Design and Practice of Plastic Concrete Anti-Seepage Wall in the Auxiliary Dam Foundation of Tianshengqiao Hydropower Station
天生桥水电站副坝基础塑性混凝土防渗墙设计与实践
15.
Application of NARI SAFR-2000H governor at Qiaogong Hydropower Station
南瑞SAFR-2000H调速器在桥巩水电站的应用
16.
Design on Dam Crest Gantry Crane and Access Bridge of Gelantan Hydropower Station
戈兰滩水电站坝顶门机及交通桥设计
17.
Applied Research on Water Cushion Pond Energy Dissipator of Xiaqiao Hydroelectric Power Station;
水垫塘消能工在下桥水电站的应用研究
18.
Retrofit and Design of Increasing Capacity and Cavitation Resistance of Hydraulic Turbine for Guanan Gaoqiao Power Station;
广安高桥水电站水力机组增容防蚀改造设计