说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 自平衡静载荷试验
1)  the self-balanced static load testing method
自平衡静载荷试验
2)  self-balanced static load test
自平衡静载试验
3)  serf-balance load test
自平衡荷载测试
4)  deep plate-loaded test with self-balancing method
自平衡深层平板载荷试验
1.
The article elaborates on the theory of deep plate-loaded test with self-balancing method,analyzes the source of error in the test of pile lateral friction by deep plate-loaded test with self-balancing method and verifies the error in engineering practice.
文章主要论述了自平衡法深层平板载荷试验原理,分析了应用自平衡深层平板载荷试验成果推算基桩侧阻力的误差来源,并通过工程实践验证了这种误差,对采用自平衡深层平板载荷试验验证基桩承载力的理论和实践有一定的指导意义。
5)  deep plate-load test with self-balancing method
自平衡法深层平板载荷试验
6)  static load test
静载荷试验
1.
The application of the connecting pipe technique in vertical static load test of single pile;
连通管技术在单桩竖向静载荷试验中的应用
2.
The discussion on shaft resistance and tip resistance of pile assayed through static load test
论通过静载荷试验测定桩侧摩阻力及桩端阻力
3.
Based on the results of static load tests,the bearing capacities of bored piles and bored piles with expanded branches were analyzed.
阐述了挤扩多支盘桩在软土地区的应用情况,通过现场静载荷试验,分析了钻孔灌注桩和挤扩多支盘灌注桩的承载力,采用高应变动力试验方法,研究了多支盘灌注桩的承载性质,从而提高了支盘的承载力。
补充资料:静平衡试验
分子式:
CAS号:

性质: 用去重或加重的方法将运转机械的转子的重心点调整到其回转中心线上的过程。不论转子的制造过程精度多么高,但由于材料的不均匀和不可避免的制造误差,平衡试验都是不可少的工序。具体做法是将带有心轴的转子支撑在水平的导轨上。偏离了回转中心的重心点1(图暂缺),总要下坠转到最低点位置,平衡块2需加在通过点1的直径另一端。改变平衡块2的质量直到可“随遇平衡”时为止,再将2最终固定,即完成静平衡工序。设转子原质量M,平衡块2质量m,通过上述试验必有Me=mR。转子以角速度ω运转时也必有Meω2=mRω2,即是说重心的偏移所产生的离心惯性力被平衡块的反向的离心力所抵消,可达到无振动运行。但实际上总是有误差存在,平衡只是相对的,Me-mR=h≠0。h称为质径积,是代表平衡精度或误差指标的参数。上述静平衡试验只解决了离心惯性力的不平衡问题。对于长径比较大或高速旋转的转子,还有惯性力矩不平衡问题,需要进行动平衡试验加以彻底解决。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条