1)  formwork support
支模架
1.
Study on safety assessment of formwork support construction;
支模架施工安全性的评价研究
2.
This article introduces a project,in which the door shape steel tubular scaffold is used as the formwork support in a super large section and super large span prestressed girder construction,by which the problem of formwork support setting up is resolved.
介绍了一工程中,超大截面、超大跨度的预应力大梁支模架进行设计时采用门形钢管脚手架,解决了该工程的支模架的搭设问题。
3.
Currently,fastener steel pipe formwork support is usually adopted as horizontal concrete compo-nent formwork support in China,and collapse accidents of high and large formwork support often happen on construction site.
当前我国水平混凝土构件支模常采用扣件式钢管支模架,施工现场高大支模架坍塌事故时有发生。
2)  fracture apparatus
造模支架
1.
Method A reformed simplified fracture apparatus was designed and tested on 78 male Sprague-Dawley rats.
方法:简化设计并制作骨折造模支架。
3)  formwork support
模板支架
1.
Design and construction for formwork support of high suspended structure at the top of cylinder;
仓筒顶部高空悬托结构模板支架设计与施工
2.
The design calculation of formwork support and scaffold at the construction site is controlled by structure stability and belongs to structural mechanics which is rather difficult to calculate.
建筑施工现场常用的模板支架与脚手架的设计计算是由结构稳定控制的,是理论性很强、分析计算很难的结构力学领域。
4)  support girder
支模桁架
5)  form support
模板支架
1.
The pitching scheme for the large-span form support in a certain project is analyzed,the bearing capacity of the whole system and the settlement value of the support are calculated,and the whole supporting system is verified combined with accumulated preloading test.
对某大跨度模板支架搭设方案进行设计分析,计算整个体系的承载能力及支架沉降数值,并结合实际的预压堆载试验对整个支撑体系进行分析验证。
6)  hard-shelf branch-mould
硬架支模
1.
Application on hard-shelf branch-mould installing SP plate in frame structure;
硬架支模安装SP板在框架结构中的应用
补充资料:木工支模拆模安全技术操作规程
第1条 模板支撑不得使用腐朽、扭裂、劈裂的材料。顶撑要垂直,底端平整坚实,并加垫木。木楔要钉牢,并用横顺拉杆和剪刀撑拉牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。