说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 无架眼支模
1)  formwork without scaffold hole
无架眼支模
2)  non-bracket turnover form method
无支架翻模法
1.
The application of non-bracket turnover form method in high pier construction;
无支架翻模法在高墩施工中的应用
3)  stentless
无支架
1.
Study on application of the CS stentless pericardial mitral valve;
CS无支架心包二尖瓣应用研究
2.
Optimization design for CS stentless quadrileaflet pericardial mitral valve and finite element analysis;
CS无支架四叶心包二尖瓣设计优化与有限元应力研究
3.
Rudiment Research and in Vitro Evaluation of a New Improvement Single Layer Suture Stentless Porcine Aortic Bioprosthesis
新型改良单层缝合无支架猪主动脉瓣的初步研究及体外测试
4)  without support
无支架
1.
This paper summarizes the construction experiences of lifting of steel pipe arch for Xiangjiang bridge in Xiangtan, it presents in details the cable lifting system without support for large span bridge.
本文通过湘潭市湘江大桥钢管拱吊装的施工实践,详细介绍了大跨径桥梁无支架缆索吊装系统的施工技术。
2.
<Abstrcat>Combined with the construction of Wusong River Bridge,the paper discussed the construction control technology of tie arch bridge without support.
结合对吴淞江大桥主跨下承式系杆拱桥无支架施工法,通过对拱肋加工、安装,纵梁安装,横梁安装,吊杆张拉等施工阶段精确计算和严格监控,有效地控制了钢管拱肋的线型,使拱桥的内力符合设计要求。
5)  non-bracket
无支架
1.
Non-bracked construction project was applied in construction of 2′nd slope flyover bridgeX007,which provides successful experience for construction of big-span,high-suspending,and non-bracket steel arch bridge.
X007线二中坡跨线桥采用无支架施工方案,为大跨度、高起吊、无支架刚拱结构桥梁的施工积累了成功的经验。
6)  Stentless valve
无支架瓣
补充资料:木工支模拆模安全技术操作规程
第1条 模板支撑不得使用腐朽、扭裂、劈裂的材料。顶撑要垂直,底端平整坚实,并加垫木。木楔要钉牢,并用横顺拉杆和剪刀撑拉牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条