1) preventing-grout wall
止浆墙
1.
The design plan is that preventing-grout wall is constructed at the point of swelling earlier and full-face curtain grouting is brought into effect for the forward surrounding wall.
设计采用先在突水点设止浆墙,然后再对前方围岩进行全断面深孔预注浆进行堵水,施工实践表明该处理方式是成功的,目前,隧道施工已顺利通过突水地段。
2) reinforcement of stoping the thick liquid wall
止浆墙加固
3) design of grout-stopping wall
止浆墙设计
4) cut-off wall
止水挡墙
1.
Simulation of seepage field in the foundation pit adopting cut-off wall;
采用止水挡墙的基坑渗流场模拟
5) seepproof screen
止水墙
6) exterior wall sand pulp
外墙砂浆
补充资料:止止不须说
【止止不须说】
(杂语)佛于迹门法华止舍利弗请之语。法华经方便品曰:“止止不须说,我法妙难思,诸增上慢者,闻必不敬信。”
(杂语)佛于迹门法华止舍利弗请之语。法华经方便品曰:“止止不须说,我法妙难思,诸增上慢者,闻必不敬信。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条