1) water-stop grouting
止水灌浆
2) grouting to waterproof
灌浆止水
1.
In the construction of Guangxi Laibin Power Station,some construction methods were adopted,including underwater blasting foundation excavation,stone covering and leveling,building prefabricating,floating transportation and insertion,underwater concrete fixing and sealing,interface grouting to waterproof,tube hidden\|excavation and connection,and the technology named Buried Floating Box.
在广西来宾 B电厂采用了基础水下爆破开挖 ,抛石整平 ,构筑物船坞预制 ,水上浮运就位 ,水下混凝土封固 ,界面灌浆止水 ,隧道暗挖连接的“埋置浮箱法”施工技术 ,不仅减少了工程难度 ,降低了工程成本 ,保证 1个枯水期完成全部水下工程 ,并且不受水位变化的影响 ,为同类工程施工开创了新的技术领域。
3) cast-in-place bored pipes
钻孔灌浆止水桩
4) Grouted curtain (cut-off wall)
灌浆止水隔幕
5) chemical double pipe jet grouting method
二重管化学止水灌浆
6) grouting cement
灌浆水泥
1.
To study the performance and microstructure of micro -fine high performa nce grouting cement (abbr.
以超细水泥、Ⅰ级粉煤灰、磨细矿渣及含铝质增强组分制备了超细高性能灌浆水泥(简称MHPGC),其中以粉煤灰为主的多组分复合改性材料占45%以上。
补充资料:止止不须说
【止止不须说】
(杂语)佛于迹门法华止舍利弗请之语。法华经方便品曰:“止止不须说,我法妙难思,诸增上慢者,闻必不敬信。”
(杂语)佛于迹门法华止舍利弗请之语。法华经方便品曰:“止止不须说,我法妙难思,诸增上慢者,闻必不敬信。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条