1)  underground structure group engineering
地下洞库群工程
1.
Considering the actuality of underground structure group engineering,the model of cost control system of underground structure group engineering is deeply researched and how to develop a cost control system is discussed.
结合地下洞库群工程的现状,深入研究了地下洞库群工程成本控制系统的模型构成,对成本控制系统的开发进行了详细的分析和设计。
2)  large-scale underground structure group engineering design
大型地下洞库群工程设计
3)  underground structure group construction
地下洞室群施工
1.
According to the characteristics of underground structure group construction in hydraulic power project,a method for schedule forecasting and control based on real-time simulation was presented with cycle ope-ration network simulation and network analysis techniques.
针对水电工程地下洞室群的施工特性,采用循环网络仿真与网络计划分析技术,提出了基于实时仿真的地下洞室群施工进度预测与控制方法。
4)  underground cavern group
地下洞群
5)  underground cavity
地下工程洞体
1.
Mechanics analysis of water bursting conditinos of underground cavity;
地下工程洞体突然涌水条件的力学分析
6)  large-scale underground structure group construction
大型地下洞室群施工
1.
The large-scale underground structure group construction is an extremely complicated process.
大型地下洞室群施工是一个极其复杂的过程 。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)


坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle

一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条