说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 开挖工序
1.
Large-span and Multi-arch Tunnel Excavation Procedure of Highways
高速公路大跨度连拱隧道开挖工序研究
2.
Study on the Displacement Back Analysis and Optimum Design of Excavation Subsequence in Underground Engineering;
地下工程位移反分析及开挖顺序优化方法研究
3.
Study on Construction Procedure and Excavation Method of the Large Underground Powerhouse;
大型地下厂房施工程序及开挖方法研究
4.
3D Optimization Analysis of Excavation and Support for Underground Powerhouse at Nuozhadu Power Plant;
糯扎渡大型地下厂房开挖施工顺序和锚固参数的优化分析研究
5.
The Option of Excavation Sequence of Large-sized Underground Cavern and the Research of Construction Technique of Underground Factory;
大型地下洞室群开挖顺序选择及地下厂房施工技术研究
6.
Technique for Deep Pit Construction with No-supported Dig
无支护式明挖扩大基础深基坑开挖施工技术
7.
Construction of Dragging Pipe under Complex Condition of Non-excavation
复杂施工条件下非开挖拖拉管的施工
8.
Research on Reverse Circulation Technology of Drill Dregs Removal in Trenchless Technology
非开挖施工中反循环清渣工艺的研究
9.
On the trenchless construction technology of horizontal directional drilling in sewerage projects
排水工程水平定向钻非开挖施工技术
10.
Numerical Simulation of the Excavation Sequence in Long-Span Full Coal Drift
大跨度全煤巷道开挖顺序数值模拟研究
11.
Optimal Analysis of Excavation Sequence and the Structure of Shallow, Unsymmetrical Pressure, Twin-arch Tunnels;
浅埋偏压连拱隧道开挖顺序与结构优化分析
12.
Sequential Pattern Mining in Software Repository
序列模式挖掘在软件开发信息库中的应用
13.
Research of Bias Tunnel Excavation Sequence and Supporting Structure Optimization
偏压地形隧道开挖顺序及支护结构优化研究
14.
Intelligent optimization analysis of excavation and support sequence of tailrace tunnel for Shuibuya Project
水布垭尾水洞开挖与支护顺序的智能优化分析
15.
Time Series Data Mining Applied Research Based on Artificial Neural Network;
基于人工神经网络的时序数据挖掘应用研究
16.
On Mining the Causes of Quality Loss Using Improved Decision Trees
基于改进决策树的工序质量损失原因挖掘研究
17.
Reforming projects of sintering process in Shaoguan smelterⅡsystem
韶关冶炼厂Ⅱ系统烧结工序挖潜改造设计
18.
The workmen exposed the gas pipe.
工人们挖开地面使煤气管露出。