1) Goupitan Arch Dam
构皮滩拱坝
1.
Based on the limit state of structure of Goupitan Arch Dam, stochastic finite element equations are derived and then programmed.
从构皮滩拱坝结构的极限状态出发推导随机有限元方程,进而编制程序,通过有限元程序分别对水位、渗流、温度、构造裂隙、基岩的弹模变化等对拱坝可靠度进行计算,从而找出对该拱坝可靠度影响的敏感因素。
2) Goupitan Concrete Double-arch Dam
构皮滩双曲拱坝
3) Ertan arch dam
二滩拱坝
1.
Feedback analysis of material parameters of Ertan arch dam and its foundation rock;
二滩拱坝及坝基材料参数反馈分析
2.
Feedback analysis on temperature field of Ertan arch dam in operation period;
二滩拱坝运行期坝体温度场反馈分析
3.
Design and optimization study of the dam safety monitoring on the Ertan arch dam;
二滩拱坝安全监测设计及优化研究
4) Baihetan arch dam
白鹤滩拱坝
1.
Nonlinear analysis of overall safety factor for Baihetan arch dam;
白鹤滩拱坝整体安全度的非线性分析
5) Jinshuitan Arch Dam
紧水滩拱坝
1.
The control network for deformation observation for Jinshuitan Arch Dam is composed of that at horizontal and elevation.
紧水滩拱坝变形监测控制网包括平面和高程监测网,为了提高监测网精度,达到预期效果,文章着重就监测网的布设、作业中采用的技术标准和外业观测进行了讨论、分析,且对外业观测的质量进行评估,最后还对网进行了平差计算及确定了基准点。
补充资料:皮科特坝
皮科特坝 |
Picote Dam |
概 述 |
皮科特坝位于葡萄牙东北部杜罗(Duero)河上,距离最近的城市为布拉干萨(Braganca)省米兰达(Miranda)市。混凝土双曲拱坝,最大坝高100m,水库总库容0.6375亿m3。电站装机容量18万kW,平均年发电量10.38亿kW·h。工程主要用于防洪和发电。工程于1954年开工,1957年第一台机组发电。 |