说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 构皮滩拱坝
1)  Goupitan Arch Dam
构皮滩拱坝
1.
Based on the limit state of structure of Goupitan Arch Dam, stochastic finite element equations are derived and then programmed.
构皮滩拱坝结构的极限状态出发推导随机有限元方程,进而编制程序,通过有限元程序分别对水位、渗流、温度、构造裂隙、基岩的弹模变化等对拱坝可靠度进行计算,从而找出对该拱坝可靠度影响的敏感因素。
2)  Goupitan Concrete Double-arch Dam
构皮滩双曲拱坝
3)  Ertan arch dam
二滩拱坝
1.
Feedback analysis of material parameters of Ertan arch dam and its foundation rock;
二滩拱坝及坝基材料参数反馈分析
2.
Feedback analysis on temperature field of Ertan arch dam in operation period;
二滩拱坝运行期坝体温度场反馈分析
3.
Design and optimization study of the dam safety monitoring on the Ertan arch dam;
二滩拱坝安全监测设计及优化研究
4)  Baihetan arch dam
白鹤滩拱坝
1.
Nonlinear analysis of overall safety factor for Baihetan arch dam;
白鹤滩拱坝整体安全度的非线性分析
5)  Jinshuitan Arch Dam
紧水滩拱坝
1.
The control network for deformation observation for Jinshuitan Arch Dam is composed of that at horizontal and elevation.
紧水滩拱坝变形监测控制网包括平面和高程监测网,为了提高监测网精度,达到预期效果,文章着重就监测网的布设、作业中采用的技术标准和外业观测进行了讨论、分析,且对外业观测的质量进行评估,最后还对网进行了平差计算及确定了基准点。
6)  arch dam's structure
拱坝结构
补充资料:皮科特坝

皮科特坝

Picote Dam


概  述

  皮科特坝位于葡萄牙东北部杜罗(Duero)河上,距离最近的城市为布拉干萨(Braganca)省米兰达(Miranda)市。混凝土双曲拱坝,最大坝高100m,水库总库容0.6375亿m3。电站装机容量18万kW,平均年发电量10.38亿kW·h。工程主要用于防洪和发电。工程于1954年开工,1957年第一台机组发电。
  坝址处河谷地形对称,岸坡陡峭,坝顶处河谷宽度约100m,坝基基岩为坚硬的花岗岩。
  坝址以上控制流域面积6.5万km2,400年来实测最大历史洪水流量7300m3/s,设计洪水流量(千年一遇)11000m3/s。水库蓄水面积2.10万km2
  工程主要建筑物包括大坝、溢洪道、地下厂房等。
  坝顶长139m,坝底宽22m,体积20.5万m3
  溢洪道为坝顶滑雪式溢洪道,分成4孔,由4扇尺寸为20m×8.6m的弧形闸门控制。当溢流堰堰顶水头14.95m时,单宽流量140m3/(s·m),落差70.5m。滑雪式溢洪道与坝体是两个弹性不同的独立结构,用伸缩缝分开,溢洪道混凝量为8万m3。对滑雪道的平面收缩,水流挑射角,齿槛设置等问题进行过充分研究。选择反弧半径30m,挑角28°。运用时,水流被向心地抛射到下游河床,在齿槛作用下,水流扩散,充分掺气,河床内流速分布很理想,岸边流速很低。实践表明,下游冲刷主要由大洪峰流量造成,而历时长的洪水影响较轻。
  地下厂房布置在右岸,装3台单机容量为6万kW的机组。尾水洞出口布置在溢洪道下面,使尾水不受泄洪水流干扰,减少汛期的水头损失。
  3条压力管道,断面为圆形,平均长度90m,开挖内径7.25m,其坡度分别为97.99%、99%和100%。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
滩坝  拱坝  构皮滩水电站 
  ©2011 dictall.com