1.
Study of RCC Arch Dam Structure of Longshou Hydropower Project;
龙首水电站碾压混凝土拱坝结构研究
2.
Force Analysis of the Roller Compacted Concrete Arch Dam in Bailianya Hydropower Station
白莲崖水电站碾压混凝土拱坝结构受力分析
3.
Three-Dimensional Nonlinear Finite Element Analysis of Dam Structure and Abutment s Stability in Xiluodu;
溪洛渡高拱坝结构特性及坝肩稳定性三维非线性有限元分析
4.
Analysis Theory and Method of Stabilization Anomaly and Shape Optimization for High Arch dams
拱坝结构稳定转异和体形优化分析理论和方法
5.
Analysis of Concrete Arch Dams by Nonlinear Finite Element and Study of Crack Calculated;
混凝土拱坝结构的非线性有限元分析及裂缝计算研究
6.
Stochastic Reliability Analysis and Model Test Research of High RCC Arch Dam;
高碾压混凝土拱坝结构可靠度分析与破坏试验研究
7.
Linear Complementarity Method for 3D Elasto-Plastic Contact Problem and Non-entirety Analysis of Arch Dams;
三维弹塑性接触问题的线性互补方法及拱坝结构非整体性分析研究
8.
Safety Analysis and Simulation of Flood Discharge of High Arch Dam and Counter-arch Plunge Pool;
高拱坝及反拱水垫塘结构泄洪安全分析与模拟
9.
Analysis on Forced Behavior of High Arch Dam s Outlet Bearing Structure;
高拱坝泄洪孔支承结构工作性态分析
10.
The Static and Dynamic Analysis on High Arch Dam with Attachment Structure System and Model Simulation
高拱坝及其附属结构体系静动力分析与模拟
11.
STATIC AND DYNAMIC STRUCTURE ANALYSES OF ARCH DAM BY MODEL TEST AND ANALYTICAL METHOD
拱坝的静力与动力结构模型试验及针算分析
12.
Researches on Finite Element Simulating Methods for Complicated Arch Dam Structure;
复杂结构拱坝的有限元仿真分析方法研究
13.
Study on Systematical Engineering Geology of Controlling Rock Mass Structure in Dagangshan Arch Dam Foundation;
大岗山拱坝坝基(肩)控制性岩体结构的系统工程地质研究
14.
Study on Structure Jointing of Ameliorating Temperature Stress Concentration in Steep Slope of High Arch Dam;
改善高拱坝陡坡坝段应力集中的结构分缝形式研究
15.
Study of Control Effect of Rockmass Structure on Dam Abutment Rockmass Deformation and Failure of High Arch Dam of Tiger Leaping Gorge Hydroelectric;
虎跳峡水电站高拱坝坝肩岩体变形破坏的岩体结构控制效应研究
16.
Coupling Analysis of Elevator Shaft Structure and Arch Dam under Earthquake
地震作用下的电梯井结构与拱坝坝体的耦联分析
17.
A separate structure is provided to block the space between the arch dam and the reservoir bank.
需要另有一种单独的结构物来填补拱坝的库岸之间的空间。
18.
Finite Element Method Analysis of High Arch Dam Pre-Stressed Pier with Submodeling Method;
用子模型方法进行高拱坝预应力闸墩结构有限元分析