说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 支模
1)  supporting formwork
支模
1.
The paper introduces multiple symmetrical pull-piece design and application in steel concrete wall supporting formwork by engineering example,compares advantage and disadvantage with traditional pull-bolt and pull-bar.
通过工程实例介绍了钢筋混凝土墙体支模中的复式对拉件设计及应用,并与传统的对拉螺栓和对拉条的优缺点进行了对比。
2.
This paper introduces multiple symmetrical pull piece and its application in supporting formwork of concrete wall construction through a project example , compares its merits and demerits with traditional pull bar and pull bolt, and carries out designing and checking computation .
通过工程实例介绍了复式对拉件及其在混凝土墙体支模中的应用 ,将其与传统的对拉螺栓和对拉条的优缺点进行了对比 ,结合实例对其进行了设计验算 ,实践表明对基础两侧地基松软和有抗渗要求的构筑物 ,混凝土墙体支模采用复式对拉件更为实用方便 ,效果好且不损坏模板 ,还提高了模板的周转
2)  form erecting
支模
1.
The paper introduces the construction method of using bolted fixture to improve the form erecting process in brick-and-concrete composite construction and this method has also produced an obvious result.
文章介绍了砖混结构模板体系中应用螺栓夹具等改进的支模工艺的施工方法,并取得了明显的效果。
3)  form erection
支模
1.
The practice shows that for the buildings the both sides of which s foundation are soft and have the requirement for impermeability, the duplex counter part, which should be adopted in the wall form erection, is practicable and convenient, its effect is good and doesn t damage the forms, and can increase the tur.
通过工程实例介绍了复式对拉件设计及其在混凝土墙体支模中的应用,并与传统的对拉螺栓和对拉条的优缺点进行了对比。
4)  model set technological
支模工艺
1.
This paper introduces the preloading model set technological in heating furnace, preloading model set technological can increase the quality of heating furnace and the life of furnace lining highly.
在加热炉中采用预加载荷支模工艺,能提高加热炉施工质量,大大提高炉衬寿命。
5)  fracture apparatus
造模支架
1.
Method A reformed simplified fracture apparatus was designed and tested on 78 male Sprague-Dawley rats.
方法:简化设计并制作骨折造模支架。
6)  help patterns
支援模式
补充资料:木工支模拆模安全技术操作规程
第1条 模板支撑不得使用腐朽、扭裂、劈裂的材料。顶撑要垂直,底端平整坚实,并加垫木。木楔要钉牢,并用横顺拉杆和剪刀撑拉牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条