1)  high-formwork
高支模
1.
Discussion on the construction and safety of high-formwork;
浅谈高支模的施工和安全
2.
10.5 m high-formwork technology in the first floor construction of duty-free building in Shenzhen;
深圳免税大厦首层10.5m高支模技术
2)  high-supported formwork
高支模
1.
Construction technology of high-supported formwork of Shenzhen convention and exhibition center;
深圳会议展览中心高支模施工技术
2.
The article introduced the constructive scheme be changed form post pouring belts to sequence methods ensure the construction quality,and shorten the build time in Guangzhou New Railway Station high-supported formwork,large span,super large section floor slab of Wuhan-Guangzhou Passenger Dedicated Railway.
介绍在武广客运专线广州新客站主站房高支模、大跨度、超大面积楼板施工中,由原设计后浇带施工改为"跳仓法"施工的技术措施,既确保了质量,又缩短了工期,可供同类工程参考。
3)  high-formwork supports
高支模
1.
By establishing the three-dimensional finite element model of high-formwork supports,the author carries on non-linear bucking analysis,and qu.
目前有关高支模的国家规范尚未正式颁布,在高支模的设计和施工方面还没有一个统一的标准,导致高支模施工坍塌事故时有发生。
4)  ultra-high formwork erection
超高支模
1.
In this article, the author introduces some aspects of the 20 meters ultra-high formwork erection system of a project such as design, construction method, safety measures and application effect.
介绍了某工程的20m超高支模体系的设计、施工方法、安全措施和应用效果。
5)  high bracing and formwork
高架支模
6)  high scaffolding for bracing form
高支模架
1.
Based on the collapse of the high scaffolding for bracing forms,the cause of collapse was analyzed;it was that the constructional requirements of standard were not met.
以某梁板高支模架倒塌事故为背景,分析高支模架倒塌原因是没有按照规范构造要求搭设;分别应用刚性节点和铰接节点模型分析脚手架竖向剪刀撑的重要性,发现对于铰接节点模型,加上剪刀撑以后使基本单元从几何可变体系变为几何不变体系;对于刚接节点模型,建模分析计算发现,立杆在加上剪刀撑后构件的轴力要比没有加剪刀撑时轴力减少25%以上。
补充资料:木工支模拆模安全技术操作规程
第1条 模板支撑不得使用腐朽、扭裂、劈裂的材料。顶撑要垂直,底端平整坚实,并加垫木。木楔要钉牢,并用横顺拉杆和剪刀撑拉牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。