说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 现状铁路
1)  present situation of railway
现状铁路
2)  modern railway
现代铁路
1.
This paper starts with the whole-process management of cost budget,plan,accounting and cost analysis,provides cost control thinking and methods which suitable for modern railway construction project in order to reduce costs,increase profit and improve the competition and subsist ability of an enterprise.
利用目标成本管理方法和原理,从成本的预测、计划、控制、核算、分析等全过程管理活动出发,找出适合现代铁路施工企业成本管理的思路和方法,达到降低成本、增大效益,提高企业的竞争水平和生存能力。
3)  existing railroad
现有铁路
4)  circular railway
环状铁路
1.
In 1995, with the Baozhong railway being open to thetraffic, a circular railway, which is consist of the railways of Longhai, Baozhong, Baolan and joins three railway pivotal cities── Lanzhou, Baoji, Zhongwei in the middle of Northwest China, appears spontaneously.
本文在揭示陇海─宝中─包兰环状铁路沿线旅游资源优势、剖析其旅游业发展现状的基础上,提出了该区域旅游业可持续发展的6条思路。
5)  present situation of roads
道路现状
6)  exisiting highway network
现状路网
补充资料:《士地利用现状调查技术规程》


《士地利用现状调查技术规程》
Technical Rules of Land Use Survey

  tudi liyong xianzhuang diaoeha iishu guicheng《土地利用现状调查技术规程》(几c入几耐尺诚sof肠耐Usesu几粉尸)1984年9月中国全国农业区划委员会为贯彻国务院批转农牧渔业部、国家计划委员会、林业部、城乡建设环境保护部和国家统计局《关于进一步开展土地资源调查工作报告的通知》而制定的,适用于全国土地利用现状调查的技术规程。全文共8章38条,约2侧】)字。主要内容包括:土地利用现状调查的任务、目的、调查单位和步骤;土地利用现状分类及其含义;调查的准备工作、技术培训与资料搜集;有关权属界、地类、线状地物调绘的基本要求以及外业调查登记表的填写;航片转绘的精度要求及方法;土地面积量算的精度要求及方法和土地利用现状面积统计;土地利用现状图的编制与调查报告的编写和检查、验收的标准与步骤等。该规程是保证全国土地利用详查质量的指令性技术文件。规程附录有:土地利用现状调查面积量算统计表;一些线状地物宽度量测边界示意图;高斯投影图幅面积和图廓近似大小表;土地利用现状图例。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条