说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 引桥
1)  approach bridge
引桥
1.
In this paper,the structure,design and construction features of the 32-m span continuous girder of the approach bridge of the Bridge are presented.
介绍该桥引桥32 m连续梁的构造、设计和施工特点。
2.
The essay summarizes the status of Wuhu Yangtze River Bridge, analyzes the direct causes that lead to speed limit forapproach bridge, which include insufficiency of transverse rigidity for 32 m T beam, insufficiency of transverse rigidity for framed light pier,and poor dynamic performance of freight train.
分析芜湖长江大桥引桥限速的直接原因—跨度32mT梁横向刚度不足,框架式轻型桥墩横向刚度不足,货车动力学性能不良。
3.
Wuhn Changjiang River Bridge is a bridge for highway and railway, the main contents of its approach bridge design are introduced.
介绍该桥引桥方案设计的主要内容。
2)  approach span
引桥
1.
Approach spans of Hangzhou Bay Sea-Crossing Bridge in region of high piers will connect the navigation spans and approach spans in low piers region.
杭州湾跨海大桥高墩区引桥是连接航道桥和低墩区引桥的桥梁,按其所处位置分为4段,分别是南航道桥南、北引桥和北航道桥南、北引桥,均采用70 m整孔预制吊装的预应力混凝土连续箱梁结构。
2.
In the overall length of the Bridge,the length of the approach spans alone accounts for approximately 95%.
杭州湾跨海大桥建设条件复杂,工程规模浩大,引桥占全桥总长95%左右,海上和滩涂区引桥上部结构分别采用跨度70 m和50 m预制箱梁,整孔预制架设。
3.
The approach spans flanking the south and north sides of the main bridge are composed of 30-m span prestressed concrete continuous rigid-frame structures.
沈阳市富民桥主桥采用(89+242+89)m的折线形双塔单索面预应力混凝土斜拉桥,南北引桥采用跨径30m的预应力混凝土连续刚构。
3)  bridge approach
引桥
1.
Repairing and Reinforcing Scheme of Crossbeam for Bridge Approach of Binzhou Yellow River Bridge;
滨州黄河大桥引桥横隔梁维修加固方案
2.
In this paper, the successful application of large-span steel tied arch bridge in Dalian new port 300,000-ton crude oil import terminal on the bridge approach is described below.
本文就大跨度全钢系杆拱在大连新港30万吨级进口原油码头引桥上的成功应用做以下介绍。
4)  approach [英][ə'prəʊtʃ]  [美][ə'protʃ]
引道,引桥
5)  bridge-like drainage
桥式引流
6)  bridge approach
桥头引道
1.
Control of bridge approach settlement is a key problem to prevent from bumping at bridge-head.
桥头引道沉降控制是防止桥头跳车现象的关键问题,在桥头设置搭板是防止桥头现象的常见措施之一,其主要目的是控制桥头纵坡变化值。
2.
Bridge approach settlement criterion is an important issue in solving Bridge bump,but there is not a reasonable criterion of theory in the world.
桥头引道沉降控制标准的问题是解决桥头跳车的一个重要问题,但目前国内外还没有一个理论上较为合理的标准。
3.
Control of bridge approach settlement is a key problem to prevent from bumping at bridge head.
桥头引道沉降控制是防止桥头跳车现象的关键问题。
补充资料:引桥
1.联接正桥和路堤的桥。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条