1) Daao Hydraulic Project
大坳水利枢纽
1.
Combined with the exploration and the test measurement,the formation reason of the solution cave of the un-typical soluble rock on Daao hydraulic project is analyzed.
采用勘探和测试手段,分析了大坳水利枢纽工程非典型可溶性岩溶洞的成因及其对工程的安全影响,并结合工程特性,提出了工程处理措施。
2) Datengxia Water Project
大藤峡水利枢纽
1.
Optimize Flood Control Dispatch and Design Proper Floodwater Storage Capacity Scale of Datengxia Water Project;
优化防洪调度 合理确定大藤峡水利枢纽防洪库容规模
3) Dalong Water Control Project
大隆水利枢纽
1.
Creation of environment-friendly construction site for Dalong Water Control Project;
大隆水利枢纽工程环境友好施工场地的创建
2.
Structural features of dam anti-seepage system for Dalong Water Control Project;
大隆水利枢纽拦河坝防渗工程结构特点
3.
Construction and quality control of curtain grouting in foundation of dam for Dalong Water Control Project;
大隆水利枢纽坝基帷幕灌浆施工与质量控制
4) Daliushu Water Control Project
大柳树水利枢纽
1.
Stability against percolation of the high concrete-faced rock-fill dam for the Daliushu Water Control Project on Yellow River;
黄河大柳树水利枢纽工程高面板堆石坝的渗流稳定性
5) large middle size water control project
大中型水利纽枢
6) hydraulic complex
水利枢纽
1.
Closure gate design for diversion tunnel of Xiaorongjiang Hydraulic Complex;
小溶江水利枢纽导流洞封堵闸门设计
2.
Sanzuodian hydraulic complex locates at the downstream of the influent Yen river of Xiliao river in Chifeng city, Inner Mongolia, which is the key project for flood control and water supply for the city in the basin plan of Songhua river and Liao river, which main task is to improve the flood control and water supply standard where locates at the distance 35Km from hydraulic complex.
三座店水利枢纽工程位于内蒙古赤峰市境内西辽河支流阴河下游,是列入松花江和辽河流域规划和赤峰市城市防洪供水规划的重点骨干工程,主要任务是提高位于枢纽下游35km处的赤峰市的防洪标准以及向赤峰市供水。
补充资料:长江三峡水利枢纽鸟瞰图
长江三峡水利枢纽鸟瞰图
长江三峡水利枢纽鸟瞰图 《中国建设企业百强榜》
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条