1.
Strategic position of Daliushu water complex in the development of northwest region;
大柳树水利枢纽在西北地区发展中战略地位的思考
2.
THE DESIGN ON LAND ERSOURCE DEVELOPMENT EXPERT SYSTEM TAKING DALIUSHU IRRIGATED AREA AS AN EXAMPLE;
土地资源开发专家系统设计──以黄河大柳树水利枢纽灌区为例
3.
DESIGN OF LAND RESOURCES ATTRIBUTE DATA BASE MANAGEMENT SYSTEM--A CASE STUDY OF IRRIGATED AREA OF DALIUSHU KEY WATER CONSERVANCY PROJECT ON HUANGHE RIVER;
土地资源属性数据库管理系统设计——以黄河大柳树水利枢纽灌区为例
4.
The Consideration of Flood Disasters in Hetao Areas along the Yellow River--An Urgent Matter to Build Daliushu Reservoir
黄河河套地区水灾频发引起的思考——修建大柳树反调节枢纽是当务之急
5.
Secure consideration for earthquake-resisting to Daliushu key water control project after Wenchuan strong earthquake
汶川大地震后对大柳树枢纽工程抗震安全性的思考
6.
Analysis of the Operating Behavior of Concrete Dam of the Danjiangkou Hydro-junction
丹江口水利枢纽砼大坝工作性态分析
7.
Seepage Characteristics of Danjiangkou Water Control Project Dam Foundation
丹江口水利枢纽大坝地基的渗流特性
8.
Construction Technology of Large Cross-Section Diversion Tunnel of Shuibuya Water Conservancy;
水布垭水利枢纽特大断面导流隧洞施工技术
9.
Design and Implement of Dam Observation System in a Certain Key Water and Electricity Control Project in Henan Province;
河南某水利水电枢纽大坝观测系统设计与实施
10.
Experimental Study on Hydraulic Model of Spillway Optimization in Dalong Key Water Control Project
大隆水利枢纽溢洪道优化水工模型试验研究
11.
An Analysis of the Maximum Operational Expenditures for Large and Medium Key Hydroprojects;
大中型水利枢纽最大可承受运行费用分析
12.
Study on Seepage in the Dam Base of Xiaolangdi Project on Yellow River;
黄河小浪底水利枢纽工程大坝坝基渗流分析
13.
Development restructuring on Dateng gorges water project and benefit analysis;
大藤峡水利枢纽建设思路调整与效益分析
14.
Discussion on the financial audit of hydraulic project with large scale;
大型水利枢纽财政审计应注意的几个问题
15.
Experimental Research on Dam Bedrock Purdah Grouting in Linhekou Hydro-junction;
蔺河口水利枢纽大坝基础帷幕灌浆试验研究
16.
Construction Design on Second-phase Cofferdam and River Closure of Tingzikou Water Control Project
亭子口水利枢纽二期围堰与大江截流施工设计
17.
Analysis of properties and causes of deformation of the Xiaolangdi Hydro Project dam
小浪底水利枢纽大坝变形特性及成因分析
18.
Some issues of early-stage work for Dateng Gorge Hydraulic Complex
关于大藤峡水利枢纽工程前期工作的几点思考