1) load rejection via dynamometry
甩汽负荷试验
1.
Test and calculation method of load rejection via dynamometry are introduced, several key factors involving the test are analyzed and discussed in detail, some suggestions are presented in the end.
介绍了甩汽负荷试验的测试方法及计算方法,深入地分析与讨论了试验过程中几个关键问题,并提出自己的见解。
2) load rejection test
甩负荷试验
1.
Analysis on system voltage calculation in load rejection test of 330MW generation units;
330MW发电机组甩负荷试验系统电压计算分析
2.
Application of plasma combustion technology to load rejection test of coal-fired generator sets;
等离子燃烧技术在燃煤机组甩负荷试验中的应用
3.
Calculation methods for inertia moment of steam turbogenerator rotor using load rejection test;
甩负荷试验转子转动惯量计算方法研究
3) load dump test
甩负荷试验
1.
The DEH system of the back pressure turbine of thermal power plant is presented in detail and the load dump test used the conventional method is developed successfully.
以某热电厂背压式汽轮机数字电液调节系统(DEH)为例,介绍了该机组DEH系统的构成、特点以及机组DEH改造后采用常规法甩负荷试验的情况。
4) load-dropping test
甩负荷试验,减负荷试验
5) Conventional load rejection test
常规法甩负荷试验
6) load rejection test using dynamometry
测功法甩负荷试验
补充资料:汽轮机甩负荷试验
汽轮机甩负荷试验
steam turbine tripping test;steam turbine load dump test
特性最直接的方法,也是较为成熟的方法,长期以来一直作为标准方法被广泛采用。一般首台新型机组或调节系统改造后的机组,必须用常规法进行甩负荷试验。这种方法适用于新机组的考核试验和新投产机组的验收试验. 测功法甩负荷试验又称甩汽负荷试验。在机组不与电网解列、突然关闭汽轮机调节汽门的情况下,记录发电机有功功率变化的过渡过程,根据功率记录曲线(见图2),经计算得到甩负荷后的瞬时最高转速,以,0,一t.s图2测功法甩负荷试验 有功功率记录曲线 尸一功率;,一转速; 山一转速飞升及描绘转速飞升曲线。这是一种间接考核汽轮机调节系统动态特性的方法。这种方法适用于新机组投产的脸收试验。 常规法和测功法甩负荷试验的特点列于表。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条