1) load dump
汽轮机甩负荷
2) turbine load rejection
水轮机甩负荷
1.
Based on the mathematical expression of casing inlet pressure, and the new complete characteristic curves of reversible pump turbine with misaligned guide vanes(MGV), the mechanism of lowing the casing inlet pressure, which is caused by turbine load rejection in the high-nominal head pumped storage plant, is analyzed.
利用基于特征线原理的蜗壳进口压力的表达式 ,结合含导叶不同步装置的水泵水轮机的全特性曲线 ,对高水头抽水蓄能电站中 ,低比转速水泵水轮机甩负荷时 ,导叶不同步装置降低蜗壳进口压力的机理进行了理论分析和探讨。
3) load of steam turbine
汽轮机负荷
4) load rejection
机组甩负荷
1.
Field test and simulation analysis of load rejection of Jiangsu Shahe Pumped-storage Power Plant;
沙河抽水蓄能电站机组甩负荷现场实测与仿真分析
5) load rejection via dynamometry
甩汽负荷试验
1.
Test and calculation method of load rejection via dynamometry are introduced, several key factors involving the test are analyzed and discussed in detail, some suggestions are presented in the end.
介绍了甩汽负荷试验的测试方法及计算方法,深入地分析与讨论了试验过程中几个关键问题,并提出自己的见解。
6) generator losing load
发电机甩负荷
补充资料:汽轮机甩负荷试验
汽轮机甩负荷试验
steam turbine tripping test;steam turbine load dump test
特性最直接的方法,也是较为成熟的方法,长期以来一直作为标准方法被广泛采用。一般首台新型机组或调节系统改造后的机组,必须用常规法进行甩负荷试验。这种方法适用于新机组的考核试验和新投产机组的验收试验. 测功法甩负荷试验又称甩汽负荷试验。在机组不与电网解列、突然关闭汽轮机调节汽门的情况下,记录发电机有功功率变化的过渡过程,根据功率记录曲线(见图2),经计算得到甩负荷后的瞬时最高转速,以,0,一t.s图2测功法甩负荷试验 有功功率记录曲线 尸一功率;,一转速; 山一转速飞升及描绘转速飞升曲线。这是一种间接考核汽轮机调节系统动态特性的方法。这种方法适用于新机组投产的脸收试验。 常规法和测功法甩负荷试验的特点列于表。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。