1) inverted-L breast wall
倒L型胸墙
1.
Comb-like breakwater and rubble mound breakwater with pressure-relieving inverted-L breast wall are innovations of breakwater structures.
梳式防波堤和带减压倒L型胸墙的斜坡堤都是防波堤结构的创新。
2) L type retaining wall
L型挡墙
1.
In this paper, considering the retaining structure—L type retaining wall used in section from Golmud to Lhasa, Qinghai-Tibet railway,we test the earth pressure or frost-heave in a frost-thaw cycle for one year,and we study several different analytic models of earth pressures and frost-heave.
结合青藏铁路格拉段目前唯一的支挡结构———L型挡墙这一工程措施 ,对墙后土压力或冻胀力进行了一个冻融循环期的现场测试。
3) inverted-L antenna
倒L型天线
4) L-shaped retaining wall
L型挡土墙
1.
Finite element method for computations of active earth pressures acting on L-shaped retaining walls with reduced friction coefficients of base bottoms
L型挡土墙主动土压力计算的基底摩擦系数折减有限元法
5) inverted L type calender
倒L型辊压机
6) inverted l calender
倒l型砑光机
补充资料:胸墙
胸墙
breast wall
X IOngq旧ng胸墙(breast wall)位于闸孔上部,处于闸室胸位的挡水墙(见图)。当水闸设计挡水位高于泄流控制水位且差值较大时,为减小闸门高度,可设置胸胸墙设置图墙。弧形闸门的胸墙一般置于闸门上游;平面闸门的胸墙可置于闸门上游或下游。胸墙与闸门间设止水件。胸墙与闸门在闸室中的位置,决定闸前水重及墩上荷载的位置和大小,因而对闸室稳定、基底及闸墩应力分布都有影响,应综合考虑各项设计要求,通过分析计算来确定。胸墙与闸墩间有固支与简支二类连接形式。固支能加强闸室横向刚度,使闸室成为整体结构,但由于水荷载、温度荷载及不均匀沉降的作用,靠闸墩处易产生裂缝,甚至产生贯穿性竖向裂缝;简支则可减小上述裂缝发生的可能性,但结构要求的厚度较大,联接处止水处理比较复杂。闸孔宽度较大时,胸墙宜采用板梁结构;宽度较小时可采用板式结构。为了使闸孔过流平顺,迎水面的底缘一般做成弧形轮廓。有些水闸设置双层闸门,上层闸门可起胸墙作用。中国葛洲坝水利枢纽二江泄水闸,闸室底孔为弧形闸门,并在其上设平面闸门,两门间设止水。只并启弧形闸门时,上部平面闸门即作为胸墙挡水;当两扇闸门全开时,则可以下泄总流量。采用这种活动胸墙,既可以减少单个闸门的高度和启闭力,又不致减小水闸的泄水能力。 (谢景惠)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条