1) Construction sequence for superstructure
上部结构施工顺序
2) construction sequence
施工顺序
1.
Soil displacements around jacked group piles based on construction sequence and compacting effects;
考虑施工顺序及遮栏效应的静压群桩挤土位移场研究
2.
Excavation scheme and construction sequence of double-arch tunnel under worse geological conditions;
较差地质连拱隧道开挖方案及施工顺序的探索
3.
The technical economy comparison for construction sequence based on soil excavation and pipe piles in soft soil region
软土地区某基坑挖土与管桩施工顺序的技术经济比较
3) construction order
施工顺序
1.
In the process,it is found that the construction order in the modeling process has a important effect on the state of the accomplished bridge.
计算发现,有限元模型中的施工顺序对成桥状态有着很大影响,应通过单元生死技术进行施工模拟。
2.
Project difficulties,construction conditions and construction order of steel structure are proposed.
指出工程难点和施工条件、钢结构施工顺序。
4) constructing order
施工顺序
1.
Statement of technique and constructing order in old building reconstructing;
浅谈旧楼改造的技术措施和施工顺序
2.
According to the anther s own experience,it summarizes the distributing order,constructing order of pipe arrangement in the front of residential districts;it also analyzes the advantages of this kind of arrangement.
根据施工经验采用科学合理的楼前管网排布顺序和施工顺序将会给施工带来安全和快捷。
5) construction procedure
施工顺序
1.
The relationship between high rise residential building strucural planning with podiums and construction procedure
带裙房的高层住宅结构方案与施工顺序的关系
补充资料:钢结构结构施工质量验收规范GB50205-2001
根据我部“关于印发《二OOO至二OO一年度工程建设国家标准制订、修订计划》的通知”(建标[2001]87号)的要求,由冶金工业部建筑研究总院会同有关单位共同修订的《钢结构结构施工质量验收规范》,经有关部门会审,批准为国家标准,编号为GB50205-2001自2002年3月1日起施行。其中,4.2.1、4.3.1、4.4.1 、5.2.2 、5.2.4 、6.3.1 、8.3.1 、10.3.4 、11.3.5 、12.3.4 、14.2.2 、14.3.3为强制性条文,必须严格执行。原《钢结构结构施工质量验收规范》GB50205-95和《钢结构结构施工质量检验评定标准》GB50221-95同时废止。
本规范由建设部负责管理和对强制性条文的解释,冶金工业部建筑研究总院负责具体技术内容的解释,建设部标准定额研究所组织中国计划出版社出版发行。
详细内容 点击下载,解压密码:machine365.com
下载声明:
· | 本站提供的所有资料 均来自互联网,资料的版权属于作者本人 。 |
· | 本站提供的所有资料 只供个人学习用,不得非法出版、销售。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条