1.
Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;
糯扎渡水电站地下厂房洞室群施工顺序研究
2.
The relationship between high rise residential building strucural planning with podiums and construction procedure
带裙房的高层住宅结构方案与施工顺序的关系
3.
3D Optimization Analysis of Excavation and Support for Underground Powerhouse at Nuozhadu Power Plant;
糯扎渡大型地下厂房开挖施工顺序和锚固参数的优化分析研究
4.
Analysis on Excavation Sequence and Support Structure Behavior of Changshao Shallow Tunnel under Unsymmetrical Pressure
长哨浅埋偏压隧道施工顺序与支护力学行为分析
5.
The technical economy comparison for construction sequence based on soil excavation and pipe piles in soft soil region
软土地区某基坑挖土与管桩施工顺序的技术经济比较
6.
design for erection stresses due to construction sequence, construction scheduling, quality control administration, and design of manufactured components.
施工顺序引起的架设应力设计、施工进程、质量控制管理和加工构件的设计。
7.
sequential processing
顺序加工,时序处理
8.
The Option of Excavation Sequence of Large-sized Underground Cavern and the Research of Construction Technique of Underground Factory;
大型地下洞室群开挖顺序选择及地下厂房施工技术研究
9.
Optimization Study on Construction Control and Closure Sequences of the Long-span and Long Connected Continuous Girder Bridge
大跨长联连续梁桥施工控制及合拢顺序优化研究
10.
Research on m*n Different Ordinal Scheduling Algorithm;
m*n不同顺序工件排序算法的研究
11.
A sequential digital computer works as follows.
顺序数字计算机的工作原理如下。
12.
Please follow the command sequence defined in Develope Kit
请按照开发工具箱中定义的命令顺序
13.
Ability to prioritise and organise work assignments; delegate work.
能够有组织有顺序的完成分配的工作。
14.
The Sequencing Optimal Method of Parallel Activities with Relaxation Quantities;
带有松弛量的平行工序顺序化优化方法探究
15.
The Sequencing Optimal Decision with Divisible Activities;
基于机动时间的可分解平行工序顺序优化研究
16.
Implementation Priorities of Information Technologies in Manufacturing Industry by Synergy;
根据协同效应确定制造业信息技术的实施顺序
17.
The engineer changed the procedure so that the work will be carried on with great facility.
工程师改变了工作程序,使工作进行得更为顺利。
18.
Load Reaction Analysis of the Girder of YongAn Bridge During Construction Procedure;
抚顺永安桥施工阶段主梁的受力分析