1) foundation enclose-hoop
基础围箍
2) confined shroud surrounding foundation
地基围箍
3) cofferdam foundation
围堰基础
1.
For satisfying the design requirement, the experimental research of physical parameters of deposited silt used as cofferdam foundation was performed.
三峡坝址河床覆盖层淤砂较厚,围堰工程施工设计又不能清除,针对堰基设计需要,对淤砂用作围堰基础的物理力学参数进行了试验研究和资料分析,提出了设计分析最不利情况的设计参数,以策安全。
4) hooping technique
围箍
1.
This paper expounds the principle of treating the existing buildings collapsible loess foundation by using the hooping technique of lime-soil comp action pile with small diameter, and through the application in some concrete en gineering, puts forward the concrete methods and requirements for its design, co nstruction and detection.
阐述了小直径灰土挤密桩围箍技术处理既有建筑物湿陷性黄土地基的原理,通过在具体工程中的应用,提出了设计、施工、检验的具体方法及要求。
5) Deep foundation exterior-protected construction
深基础围护
6) Surrounding structure for deep foundation
深基础围护结构
补充资料:箍围
1.方言。岛中的村落。因为水所环绕﹐故称。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条