说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 经济洞径
1)  economical tunnel diameter
经济洞径
1.
Namely when the tunnel total expense is the minimum,the corresponding tunnel diameter is the best,this diameter is considered as economical tunnel diameter.
如要选取适当的发电隧洞洞径,则要寻求在隧洞计算期内的总费用最小值,即只有当隧洞的总费用达到最小时的洞径才是最佳的,此时对应的洞径即是经济洞径
2)  economic pipe diameter
经济管径
1.
The Newton iteration method is used to solve the economic pressure on the unknown node, so as to calculate the economic head loss and economic pipe diameter of each section, .
采用牛顿迭代法来求解各未知节点的经济水压,进而得出各管段的经济水头损失、经济管径和水源二级泵站的经济扬程。
3)  economical pipe diameter
经济管径
1.
The choice of economical flow rate of water carriage engineering and economical pipe diameter is discussed too.
结合工程实例对城市输水工程管材的选择进行了论述 ,介绍了各种管材的优缺点 ,简述了输水工程经济流速与经济管径的选择 ,探讨了在设计施工中应注意的问题并提出了相应的改进措施 ,以适应国民经济的发展 ,缓解城市的工业用水与生活用水困难的问题。
4)  economical span length
经济跨径
1.
The concept of economical span length was firstly proposed,which reveal the economical principle for the layout of span number and length to the multi-span.
提出经济跨径的概念,不仅揭示了多跨桥梁孔跨布置的经济性原则,而且还可以清楚地说明世界桥梁界面临的两大挑战即桥梁大跨度技术与深水基础技术之间的关系。
5)  economic pipe size
经济管径
1.
Based on the technical summaries of some long-distance water delivery projects, the technical problems from the selection of pipes, water hammer protection and the safety measures, economic flow velocity, economic pipe size and some other technical problems are discussed herein, so as to give the project design a better service.
通过对多项长距离输水工程设计的技术总结,论述在南水北调河北省配套输水管道工程设计中对管材的选择、水锤的防护技术与安全措施、经济流速的计算、经济管径选择等技术问题进行探讨,以便更好地为工程设计服务。
6)  economic radius
经济半径
1.
Study on the set-dot of concrete-mixer in maintenance of expressway and the economic radius;
路面养护中拌和站设置和养护经济半径研究
2.
Taking advantage of technologyeconomic analyses and the principle of scale economy and using the research resultsof the industrial corporations for reference, the paper sets up the mathematical modelof the economic radius .
通过研究和分析,施工企业合理的高等级路面工程承包规模是由合理的承包合同段决定的,而合理的承包段决策是由材料的运输费、拌和站场设置费决定的,如何使这些费用最为合理,使工程成本最低,是以合理的拌和站场的供料经济半径、限制运距和偏心施工段为表征的;合理的施工作业段布置是通过对其产生直接作用的不考虑料场影响和考虑料场影响两种情况来分别进行分析论证的,在考虑料场影响中,还充分考虑到了在多料场条件下主料场如何布置,如何分析和计算供料经济半径、偏心施工段、最大偏心施工段以及如何最终确定最佳施工作业段的方法;施工生产规模的确定是通过研究其经济性本质与相关性,并进一步对经济性因素进行分析的基础上,来找出如何确定最佳施工生产规模的基本方法的。
补充资料:径径
1.不停貌。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条